Manufacturing method of prefabricated column, assembly method of column and beam
A prefabricated column and tooling positioning technology, which is applied to columns, piers, pillars, etc., can solve the problems of difficult on-site operation of column and beam installation, high maintenance cost in the whole life cycle, inconvenient production and manufacture of prefabricated columns, etc., and achieves easy control of installation accuracy. , Improve construction efficiency and construction quality, without the effect of operating space restrictions
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0080] See figure 1 , shows a steel structure node 10 provided in this embodiment, including a side plate 1 on the side, a top plate 2a on the top, several pairs of tie rods 3, several stirrups 4, first high-strength bolt sleeves 5, middle The cross plate 6a and the bottom plate 2b at the bottom.
[0081] In this embodiment, the side surfaces of the top plate 2a and the bottom plate 2b both extend out from the connecting portion, and both the top plate 2a and the bottom plate 2b are in the shape of a cross. Both the connecting portion of the top plate 2a and the connecting portion of the bottom plate 2b are provided with a plurality of perforations 21 along their respective thickness directions, and the reserved holes 21 are used for the steel bars of the reinforcement cage to pass through.
[0082] The connecting portion of the top plate 2a is fixedly connected to the top inner surface of the side plate 1, and the connecting portion of the bottom plate 2b is fixedly connecte...
Embodiment 2
[0143] See Figure 18 , the present embodiment provides another steel structure node 10, including a side plate 1 on the side, a top plate 2a on the top, several pairs of tie rods 3, several stirrups 4 and a bottom plate 2b.
[0144] Except for the content mentioned below, the steel structure node 10 of this embodiment is the same as that of Embodiment 1:
[0145] In this embodiment, a second high-strength bolt sleeve 8 is embedded in the perforations on the top plate 2a and the bottom plate 2b, and the second high-strength bolt sleeve 8 protrudes from the plane of the top plate 2a. The second high-strength bolt sleeve 8 is installed on the two ends of the vertical pull bolt 9, and the second high-strength bolt sleeve 8 on the top plate 2a and the second high-strength bolt sleeve 8 on the bottom plate 2b pass through the vertically arranged pull bolt. Bolt 9 connection.
[0146] The connecting portion of the top plate 2 a is fixedly connected to the top surface of the side p...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com