Cup-type pre-grouting reinforcing method for full-section curtain grouting
A curtain grouting and pre-grouting technology, which is applied in earthwork drilling, wellbore lining, tunnel lining, etc., can solve the problems of complex construction process, high cost, secondary plugging and rework, etc., and achieve obvious effect of construction period benefit
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0076] The technical solutions of the present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0077] see Figure 1-Figure 2 , a cup-shaped pre-grouting reinforcement method for full-section curtain grouting, which improves the full-section curtain grouting and adopts the concept of cup-shaped pre-grouting reinforcement, that is, through the peripheral curtain 2 (including the arch tube curtain 3) and the central hole The water-stop rock plate 4 (cup bottom) formed by bottom grouting forms a cup-shaped three-dimensional water-stop reinforcement ring to solve the two problems of water-rich fault water-stop and collapse prevention.
[0078] Before entering the fault, reserve 10m of magma-stop rock plate, and use advanced pipe shed grouting to form a pipe curtain in the 120° range of the arch, and use segmental retreat deep hole grouting for the rest of the surrounding holes to form a 360° water-stop reinforcement...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com