A method for calculating the distance between curved tracks with closed positive vector difference
A technology of curved track and calculation method, which is applied in the field of rail transit, can solve the problems such as the accumulation of positive vector difference is not easy to close, and achieve the effects of space complexity and robustness, small field workload, and low equipment requirements
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] A method for calculating the pitch of a curved track with closed positive vector difference, comprising steps S11 to S12:
[0042] In step S11, the on-site sine of the curved track is collected by the track inspection trolley, and compared with the plan sine determined by the line design data to obtain the sine difference of each measuring pile (mileage).
[0043] see figure 1 , compare the current position with the plane position of the 16mm action side under the tread at the corresponding front and rear distance of 10m, and obtain the curve site sine (such as formula (1)); calculate the corresponding mileage plan sine according to the design line parameters; according to formula (2) Calculate the positive vector difference of the current measured pile (mileage) and automatically record it together with the corresponding measured pile (mileage), forming a positive vector difference sample {Δv i |i=1,2,...,290}.
[0044] Step S12, taking the positive vector difference...
Embodiment 2
[0051] A method for calculating the pitch of a curved track with closed positive vector difference, comprising steps S21 to S22:
[0052] In step S21, the on-site sine of the curved track is collected by manually pulling strings, and compared with the plan sine determined by the line design data to obtain the sine difference of each measuring pile (mileage).
[0053] see figure 1 , the general operation of manual pulling strings often uses the outer strand track as the reference strand, and piles are set on the curve at an equal interval l (such as 10m), and the measured pile number is i (i=0,1,2,...,n,n+1 ); then with a chord line with a length of 2l (such as 20m), the two ends are close to the 16mm action side under the outer rail tread at the adjacent pile point and tensioned, and the chord vector height of the middle pile point is measured to obtain the curve site sine vector ( Such as formula (1)); according to the design line parameters, the planned sine of the correspo...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com