Method for burning off stubborn coke piles at tuyere area without discharging remainder iron during blast furnace descending lowering stockline shutdown
A technology of empty material line and tuyere area, which is applied in the field of metallurgy, can solve the problems of affecting the safety of the furnace shutdown, easily forming explosive gas, increasing the maintenance period and cost of the blast furnace, so as to save tool costs, shorten the cooling time of the furnace, and save labor The effect of griddle fees
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0054] This embodiment provides a method for shutting down the empty material line of a blast furnace without putting residual iron to burn off the dead coke in the tuyere area, which specifically includes the following steps:
[0055] (1) Install blast furnace top atomization water pumping system before shutdown, and use it normally
[0056] Install the furnace top atomization water collection system before the shutdown of the furnace. The technical requirements for the furnace top atomization water collection system are: ① The number of spray guns should reach at least 8 to achieve uniform water collection; The water particles are less than 500μm;
[0057] (2) One day before the shutdown, adjust the composition of slag and iron and the temperature of molten iron
[0058] According to the current production situation, reduce the coke load, control the coal ratio to less than 100kg / t, add serpentine, limestone, silica, and fluorite to adjust the composition of slag and iron t...
Embodiment 2
[0086] This example provides a specific embodiment of the method of shutting down the blast furnace empty material line without putting residual iron to burn off the dead coke pile in the tuyere area, using 2150m 3 The upper end of the blast furnace is the bosh 1, the center line of the tuyere 2 and the center line of the iron hole 5 are set on the blast furnace, and the dead coke pile 3 in the tuyere area and the dead coke pile 4 below the tuyere area are arranged in the blast furnace from top to bottom , dead iron layer residual iron 6 and hearth and dead iron layer inner type 7, the structure is as follows figure 1 shown;
[0087] (1) Install blast furnace top atomization water pumping system before shutdown, and use it normally (when the furnace top temperature is high)
[0088] On July 12-14, the blast furnace was scheduled to be repaired for 48 hours. Taking this opportunity, the original furnace top cooling sprinkler system was transformed into a furnace top spraying w...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com