Method and system for real-time automatic distribution of gate opening of cascade hydropower station
A flood gate, automatic distribution technology, applied in office automation, information technology support systems, complex mathematical operations, etc., can solve problems such as low work efficiency and difficulty in flood control scheduling for large and medium-sized hydropower stations
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0112] Such as Figure 1-3 As shown, the real-time automatic allocation method of the flood gate opening of the cascade hydropower station in this embodiment includes the following steps:
[0113] The first step is to formulate various reservoir water level control intervals, formulate reservoir water level control strategies according to flow levels and timeliness, and store them in the strategy library, and store the data of cascade flood control power generation facilities (such as unit NHQ curves, gate overflow curves) , storage capacity curve, flood gate constraints, etc.) are converted into static parameters of corresponding power stations according to different priority orders and cascade relationships, and stored in the database.
[0114] In this embodiment, the cascade hydropower stations: Dagangshan Hydropower Station, Pubugou Hydropower Station, Shenxigou Hydropower Station, Zhentouba Hydropower Station, Gongzui Hydropower Station and Tongjiezi Hydropower Station ar...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com