Panoramic real-time simulation method for power system
A real-time simulation and power system technology, applied in design optimization/simulation, electrical digital data processing, special data processing applications, etc., can solve problems that do not constitute a simulation system
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] Such as figure 1 It should be noted that, in the description of the present invention, the terms "horizontal", "vertical", "upper", "lower", "front", "rear", "left", "right", "vertical The orientations or positional relationships indicated by "straight", "horizontal", "top", "bottom", "inner" and "outer" are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the The description does not indicate or imply that the device or element referred to must have a particular orientation, be constructed or operate in a particular orientation, and thus should not be construed as limiting the invention.
[0045] Such as figure 1 As shown, the panoramic real-time simulation method for the power system, the following steps are performed in sequence:
[0046] A. Construct the primary system model and secondary system model of the substation;
[0047] B. After the primary sy...
Embodiment 2
[0080] The invention provides a real-time simulation method of a smart grid, including:
[0081] Step A, building a primary system model and a secondary system model respectively;
[0082] Step B, after the primary system model calculates each step and obtains the simulation data, it is written into the real-time database, that is, the primary system model is always in the calculation state, and it will be written immediately after calculating each step In the real-time database; when the primary system model calculates any step length to obtain the simulation data and writes it into the real-time database, the analog signal conversion device and the secondary system model simultaneously read the simulation data from the real-time database. data, if the GOOSE signal conversion device and the secondary system model return information to the primary system model at the same time, the primary system model forms a new topology according to the returned information for simulation, ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com