Method for temporary segmentation of distribution network

A temporary, ring network technology, applied in the installation of cables, AC network circuits, cable installation devices, etc., can solve the problems of complex construction vehicles, equipment and personnel, long operation duration, and high meteorological conditions, so as to avoid equipment reliability. The effect of reducing the reliability of power supply and power supply, minimizing the construction scope of power outages, and reducing the number of outage users

Active Publication Date: 2018-11-02
STATE GRID ZHEJIANG ELECTRIC POWER CO LTD HANGZHOU POWER SUPPLY CO +1
View PDF4 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] First, if the conventional power outage construction method is adopted, due to the large segmented range of the grid structure, a large number of users accompanying power outages will be generated outside the normal maintenance and construction power outage of some users, which will seriously affect the overall power supply reliability of the distribution network and users. Satisfaction with electricity use;
[0004] Second, if the traditional construction method of bypass cable without power interruption is adopted, the ideal effect of no power interruption for all users can be realized in theory, but in actual production, it will not be able to be carried out due to the following factors:
[0005] 1. Because the bypass cable laying and deployment and bypass switch installation are required to replace the normal operation line when the bypass cable is not powered off, a complete and long section of the overall construction channel and the bypass cable deployment channel are required, and the minimum maintenance is one level When conducting the wire, it is necessary to bypass the calculation of the third-grade wire, and usually need to have more than 150 meters of cable laying and deployment channels. These channels are often located on social vehicles and pedestrian-intensive roads. For the safety of personal and equipment, in the During the construction period, it is very unrealistic and difficult to evacuate and prohibit the normal working and living personnel and vehicles in the passage from entering and exiting.
[0006] 2. The operation lasts for a long time and requires high meteorological conditions during the operation. Once there is a temporary sudden thunderstorm or other weather change that may cause construction safety, the entire bypass cable will stop working without power failure. In severe cases, the incomplete The equipment that has been installed and laid is protected from rain or recovered, which will delay the overall construction progress
[0007] 3. The construction vehicles, equipment and personnel are complex, and the overall cable operation without power failure requires various special operation vehicles such as live working arm trucks and bypass cable laying cable cars; bypass cables, bypass switches, intermediate connectors of bypass cables, and ground A large number of special special equipment such as insulating blankets and special cover plates for bypass cables require the participation of multiple types of personnel such as bypass cable laying personnel and live working personnel. wide, high security risk
[0008] The above two operation methods are either due to the large scope of the original line segmentation, resulting in power outages for many enterprises and users not within the scope of maintenance and construction, resulting in direct economic losses
Either due to various factors such as the on-site environment, it is impossible to carry out cable non-stop operation. In the end, due to the time limit requirements such as time nodes and construction periods, the actual construction has to adopt the operation method of all power outages in sections, which seriously affects the overall power supply reliability of the distribution network and User Satisfaction with Electricity

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for temporary segmentation of distribution network
  • Method for temporary segmentation of distribution network

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0030] Such as figure 1 As shown, the method for the temporary segmentation of the distribution network of the radial connection mode proposed by the present invention specifically includes the following steps:

[0031] S1. Carry out on-site scheme investigation for the construction section of planned maintenance, determine the wiring mode of the planned maintenance section and optimize the pre-installed bypass switch and flexible cable tower;

[0032]S2. When the planned maintenance line is radial wiring, select the tower next to the first planned maintenance section 8 as the bypass switch and install point A 5;

[0033] Before the start of the planned maintenance project, if the meteorological conditions permit, use the diversion line to install the bypass switch to install the tower at point A. Install the first bypass switch 6 with live load on point A 5, use the first flexible cable 7 with a quick plug-in interface as the connecting lead, connect the bypass switch to ins...

Embodiment 2

[0037] Such as figure 2 As shown, the method for the temporary segmentation of the distribution network of the ring network connection mode proposed by the present invention specifically includes the following steps:

[0038] S1. Carry out on-site scheme investigation for the construction section of the planned maintenance, determine the wiring mode of the planned maintenance section and optimize the pre-installed bypass switch and flexible cable tower;

[0039] S2. When the planned maintenance line is the ring network connection mode,

[0040] Before the maintenance, determine the power supply on the opposite side of the planned maintenance line 14, and realize that the two ends of the second planned maintenance section 16 are respectively connected to the corresponding power supply I9 and power supply II23. The pole tower at point B and the bypass switch are installed at point C. The pole tower at point C is changed from a straight pole to a tension pole type under the sta...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a method for temporary segmentation of a distribution network. The method comprises the following steps of (S1) determining a connection mode of a planned maintenance section; and (S2) when a planned maintenance line adopts a radial connection mode, selecting a tower next to the planned maintenance section as a bypass switch mounting point A, carrying out charged on-load mounting of a bypass switch on the bypass switch mounting point A before maintenance and achieving power-on and power-off of the planned maintenance section through opening and closing of the bypass switch during maintenance; and when the planned maintenance line adopts a ring network connection mode, firstly determining an opposite-side power supply of the planned maintenance line, determining the towers at two ends of a planned maintenance range as a bypass switch mounting point B and a bypass switch mounting point C separately, carrying out charged on-load mounting of the bypass switches on the bypass switch mounting point B and the bypass switch mounting point C before maintenance and achieving power-on and power-off of the planned maintenance section through opening and closing of the bypass switches during maintenance. According to the method, the number of accompanied power outage users in the planned maintenance process can be effectively reduced and the power supply reliability is effectively improved.

Description

technical field [0001] The invention relates to the field of power grid maintenance methods, in particular to a method for temporary segmentation of distribution networks. Background technique [0002] Generally speaking, the segmentation of distribution network lines is a problem that requires comprehensive consideration of investment economy and equipment reliability. Because increasing the number of subsection switches in the distribution network and optimizing the location of the subsection switches can improve the reliability of power supply, but the increase in the number of subsection switches will lead to an increase in the overall investment of the power grid. At the same time, with the increase in the number of subsection switchgears, The reliability of equipment will also continue to decline, which will reduce the reliability of power supply. Therefore, the grid structure of the existing distribution network, regardless of the ring network connection method or the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/00H02G1/00
CPCH02G1/00H02J3/00H02J3/005
Inventor 金涛石霄峰刘欣宇方强
Owner STATE GRID ZHEJIANG ELECTRIC POWER CO LTD HANGZHOU POWER SUPPLY CO
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products