Dam pile driving method
A technology for dams and pile drivers, applied in sheet pile wall, construction, infrastructure engineering, etc., can solve the problems of swept away property, waste of fixed piles, ineffectiveness, etc., to facilitate storage and transportation, and slow down the speed of water flow. , the effect of improving efficiency and quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment
[0111] When the user uses the present invention, a method for piling a dam, the user implements it through the following steps: Step 1) Select a piling area near the dam mouth; Step 2) Move the piling machine to the vicinity of the piling area of the dam; Step 3 ) Put the water flow sensor and ultrasonic detector set on the pile frame of the pile driver into the dam opening to detect the water flow and terrain inside the dam opening, and calculate the optimal water entry position and / or the impact of the water flow on the fixed pile through the control device Angle; Step 4) Load the fixed piles used for dam construction into the pile frame above the pile driver, and lock the fixed piles by the locking device on the pile frame; Step 5) Put the pile frame above the pile driver and / or The anchor piles are moved to the optimum position and / or angle for entering the water at the mouth of the embankment. Step 6) Loosen the locking device on the pile frame, so that the fixed pile s...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com