Ground anchor setting method and ground anchor device of mining endless rope winch tail wheel system
An endless rope winch and systematic technology, applied in hoisting devices, clockwork mechanisms, etc., can solve problems such as waste, affecting timely mining of coal seam working faces, excessive manpower, material resources and time, and achieve the effect of saving manpower
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] Such as figure 1 As shown, a method for setting the ground anchor of the tail wheel system of a double-rope endless rope winch for mining, the steps are as follows:
[0022] Step 1. Before the tail wheel system of the underground endless rope winch is arranged, a ground anchor device is first made in the Inoue factory. The ground anchor device is a steel structure frame with an "m" section, supported by the top cover plate 1, The vertical plate 2 and the pressure foot plate 3 are welded; the n-shaped rib plate 4 is evenly welded on the inner section of the steel structure frame, and the vertical rib plate 5 is welded on the outside, and anchor holes 10 are provided on the protruding parts of the two sides of the pressure foot plate 3. The anchor hole 10 can be anchored on the bottom plate of the roadway with the anchor rod 9; the upper track 6 is fixed on the top surface of the steel structure frame by the pressure plate 8 and the bolt 7; , the length should meet the r...
Embodiment 2
[0026] Such as image 3 As shown, a method for setting the ground anchor of the tail wheel system of a double-rope endless rope winch for mining is characterized in that:
[0027] Step 1. Before the tail wheel system of the underground endless rope winch is arranged, a ground anchor device is first made in the Inoue factory. The ground anchor device is a steel structure frame with an "n" section, supported by the top cover plate 1, The vertical plate 2 and the pressure foot plate 3 are welded; the n-shaped rib plate 4 is evenly welded on the inner section of the steel structure frame, and the vertical rib plate 5 is welded on the outside, and anchor holes 10 are provided on the protruding parts of the two sides of the pressure foot plate 3. The anchor hole 10 can be anchored on the bottom plate of the roadway with the anchor rod 9; the upper track 6 is fixed on the top surface of the steel structure frame by the pressure plate 8 and the bolt 7; , the length should meet the re...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com