Construction method for road surface water stabilizing layer and ancillary project
A construction method and technology for stabilizing water layers, applied in the field of road construction, can solve problems such as uncompact construction, long construction period, and inability to prevent pollution, improve image and construction progress, good integrity and stability, and facilitate thickness inspection. and control effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] like figure 1 , figure 2 As shown, the invention provides a kind of construction method of pavement water stabilization layer and ancillary works, comprising the following steps:
[0039] S10. Acceptance of the road groove, the road groove 1 of the road section to be constructed is checked and accepted;
[0040] S20. Drainage construction, excavating trenches, burying horizontal drainage pipes, setting vertical ditches through slip-form construction to ensure smooth drainage during construction, and covering the vertical ditches with film for health preservation after completion;
[0041] S30. Cushion construction, carrying out the paving construction of the cushion 2 to form the pavement cushion 2;
[0042] S40. Construction of road shoulders and central divider. Slipform construction is carried out on the shoulders on both sides of the road and the central divider in the center of the road, respectively, to form two strips of road shoulder strip foundation 3 and on...
Embodiment 2
[0049] like image 3 , Figure 4 As shown, the invention provides a kind of construction method of pavement water stabilization layer and ancillary works, comprising the following steps:
[0050] S10. Acceptance of the road groove, the road groove 1 of the road section to be constructed is checked and accepted;
[0051] S20. Drainage construction, excavating trenches, burying horizontal drainage pipes, setting vertical ditches through slip-form construction to ensure smooth drainage during construction, and covering the vertical ditches with film for health preservation after completion;
[0052] S30. Cushion construction, carrying out the paving construction of the cushion 2 to form the pavement cushion 2;
[0053] S31. subbase construction, carry out pavement subbase 5 paving construction;
[0054] S40. Construction of road shoulders and central divider. Slipform construction is carried out on the shoulders on both sides of the road and the central divider in the center o...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com