Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Construction method for road surface water stabilizing layer and ancillary project

A construction method and technology for stabilizing water layers, applied in the field of road construction, can solve problems such as uncompact construction, long construction period, and inability to prevent pollution, improve image and construction progress, good integrity and stability, and facilitate thickness inspection. and control effects

Active Publication Date: 2018-07-20
GUANGZHOU YOUAN GIVIL ENG TECH CO LTD
View PDF7 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] 1. In the process of cultivating curbs and soil shoulders after the upper base is completed, cross-construction will be carried out on the upper base. Although the construction site will take a series of anti-pollution management measures for the upper base, the pollution still cannot be eliminated, and the final impact will be Sealing Bonding Effect
[0004] 2. After the water stabilization layer is completed, curbstones and other auxiliary structures are produced. The production period is long and the site area is large. After the production is completed, the installation and construction are carried out. The construction pressure of the installation and construction is relatively high, and generally requires human sea tactics The cost of rushing to work is high, and the image of the construction site is poor; after the construction and installation of the subsidiary structures, the earthing and greening are carried out, and then the construction of the asphalt surface layer is carried out. The construction interval from the completion of the upper base layer to the asphalt surface layer is too long, and the construction is not compact
[0005] 3. During the construction process, the construction road surface looks flat and barrier-free, which makes traffic control difficult. Vehicles often pass through the middle and enter the closed health care area. Even if signs are added, it is difficult to stop
[0006] 4. It is difficult to manage the civilized construction scene during water stabilization construction, the site is chaotic, and the image is poor. There is often a saying that "the image can only be produced after the asphalt layer is applied"
[0007] 5. The construction process of artificial formwork at the edge of the water stabilization is slow, the workload of the transition is large, and the efficiency is low

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for road surface water stabilizing layer and ancillary project
  • Construction method for road surface water stabilizing layer and ancillary project
  • Construction method for road surface water stabilizing layer and ancillary project

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0038] like figure 1 , figure 2 As shown, the invention provides a kind of construction method of pavement water stabilization layer and ancillary works, comprising the following steps:

[0039] S10. Acceptance of the road groove, the road groove 1 of the road section to be constructed is checked and accepted;

[0040] S20. Drainage construction, excavating trenches, burying horizontal drainage pipes, setting vertical ditches through slip-form construction to ensure smooth drainage during construction, and covering the vertical ditches with film for health preservation after completion;

[0041] S30. Cushion construction, carrying out the paving construction of the cushion 2 to form the pavement cushion 2;

[0042] S40. Construction of road shoulders and central divider. Slipform construction is carried out on the shoulders on both sides of the road and the central divider in the center of the road, respectively, to form two strips of road shoulder strip foundation 3 and on...

Embodiment 2

[0049] like image 3 , Figure 4 As shown, the invention provides a kind of construction method of pavement water stabilization layer and ancillary works, comprising the following steps:

[0050] S10. Acceptance of the road groove, the road groove 1 of the road section to be constructed is checked and accepted;

[0051] S20. Drainage construction, excavating trenches, burying horizontal drainage pipes, setting vertical ditches through slip-form construction to ensure smooth drainage during construction, and covering the vertical ditches with film for health preservation after completion;

[0052] S30. Cushion construction, carrying out the paving construction of the cushion 2 to form the pavement cushion 2;

[0053] S31. subbase construction, carry out pavement subbase 5 paving construction;

[0054] S40. Construction of road shoulders and central divider. Slipform construction is carried out on the shoulders on both sides of the road and the central divider in the center o...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method for a road surface water stabilizing layer and an ancillary project. The construction method comprises the steps that a road trough is checked and accepted, specifically, the road trough of a to-be-constructed road section is subjected to checking and accepting; drainage construction is performed, specifically, a transverse water drainage pipe is buried, and a longitudinal gutterway is arranged; cushion construction is performed, specifically, a cushion is paved to form a bed course; road shoulders and central separating area construction is performed, specifically, slip form construction is performed on both side edges and the center of a road surface to form a shoulder strip foundation and a central separating area canalization retaining wall; the construction of earth up, greening and separation of the water stability layer is performed, specifically, the road shoulders are subjected to earth up and greening and the water stability layeris subjected to paving according to the separation of the shoulder strip foundation; anti-collision guardrail construction is performed, specifically, a New Jersey barrier is installed on a upper base layer; and surface layer construction is performed, specifically, the road surface is subjected to paving of an asphalt surface layer. According to the construction method for the road surface waterstabilizing layer and the ancillary project, a working surface of the water stability layer is not polluted, the construction image is good, the construction is compact, traffic control can be performed reliably, and the construction efficiency is high.

Description

technical field [0001] The invention relates to a road construction method, in particular to a construction method for a road surface water stability layer and ancillary works. Background technique [0002] The traditional pavement construction process is to install curb stones, earthen shoulders and greening after the construction of the water stabilization layer, and finally carry out the construction of the asphalt surface layer. This construction method has the following problems: [0003] 1. In the process of cultivating curbs and soil shoulders after the upper base is completed, cross-construction will be carried out on the upper base. Although the construction site will take a series of anti-pollution management measures for the upper base, the pollution still cannot be eliminated, and the final impact will be Sealing effect. [0004] 2. After the water stabilization layer is completed, curbstones and other auxiliary structures are produced. The production period is ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01C19/48
CPCE01C19/4886
Inventor 黄祖强
Owner GUANGZHOU YOUAN GIVIL ENG TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products