Construction method for high-rise housing novel building system under general-control construction period

A technology of high-rise residential buildings and construction methods, which is applied in the direction of building construction, building material processing, construction, etc., and can solve problems such as large deviations, unformed, and unreasonable construction period data

Inactive Publication Date: 2018-07-06
佛山市万科置业有限公司 +1
View PDF4 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The current cities have no uniform standards for the construction period of new construction systems (aluminum film, intelligent climbing frame, prefabricated wall panels, all-cast-in-place exterior walls, interspersed efficiency, etc.), and most cities determine the construction period based on experience or the requirements of the construction party. The construction period data The deviation is large, irregular, and irrational, so a scientific and standardized standard construction period has not yet been formed, and it cannot reflect the construction period of each stage in the whole process of high-rise residential construction, which is not in line with the actual construction under the current new construction system

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for high-rise housing novel building system under general-control construction period
  • Construction method for high-rise housing novel building system under general-control construction period
  • Construction method for high-rise housing novel building system under general-control construction period

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0106] Embodiments of the present invention will be described in detail below.

[0107] The construction method under the general control period of the new construction system of high-rise residential buildings includes the following steps:

[0108] Foundation construction, duration of foundation construction T a The control is completed within 60 days to 210 days;

[0109] The construction period T from the foundation cushion to the positive and negative zero construction, and the foundation cushion to the positive and negative zero construction b The control is completed within 40 days to 76 days;

[0110] The construction of the main structural layer of the N-story, the construction period of the main structural layer of the N-story is T ci The control is completed within 5 to 12 days;

[0111] Construction of N-1 layer of formwork removal layer, construction period T of N-1 layer of formwork removal construction layer 1 The control is completed within 5 to 6 days;

...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method for a high-rise housing novel building system under the general-control construction period. The construction method comprises the following steps that foundation construction is conducted; a foundation under layer is constructed till the foundation under layer reaches the plus-or-minus-zero height; an N-layer major structural layer is constructed;an (N-1)-layer template-dismounting layer is constructed; an (N-2)-layer roof-propping water-stopping layer is constructed; an (N-3)-layer inner wallboard mounting layer is constructed; an (N-4)-layer ceiling putty layer is constructed; an (N-5)-layer ceiling suspending layer is constructed; an (N-6)-layer kitchen and bath brick laying layer is constructed; an (N-7)-layer hall and room brick laying layer is constructed; an (N-8)-layer windowsill mounting layer is constructed; an (N-9)-layer wall surface putty layer layer is constructed; an (N-10)-layerindoor door mounting layer is constructed; an (N-11)-layer component mounting layer is constructed; an (N-12)-layer wood floor laying layer is constructed; and an (N-13)-layer clean-keeping land-clearing layer is constructed. According to the construction method for the high-rise housing novel building system under the general-control construction period, compared with a traditional construction method, the construction period can be shortened while the construction quality is guaranteed, the construction method is more suitable for the building construction practice under a current novel building system, all-stage working periods in the whole building process of a high-rise housing are reflected in time, and the construction method has perspectiveness within the industry and is high in practicability.

Description

technical field [0001] The invention relates to the field of building construction, in particular to a construction method under the general control period of the new construction system of high-rise residential buildings. Background technique [0002] The current cities have no uniform standards for the construction period of new construction systems (aluminum film, intelligent climbing frame, prefabricated wall panels, all-cast-in-place exterior walls, interspersed efficiency, etc.), and most cities determine the construction period based on experience or the requirements of the construction party. The construction period data The deviation is large, irregular, and irrational. Therefore, a scientific and standardized standard construction period has not yet been formed, which cannot reflect the construction period of each stage in the whole process of high-rise residential construction, and is not in line with the actual construction under the current new construction syste...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04G21/00
Inventor 于义翔郭世江
Owner 佛山市万科置业有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products