Construction method for high-rise housing novel building system under general-control construction period
A technology of high-rise residential buildings and construction methods, which is applied in the direction of building construction, building material processing, construction, etc., and can solve problems such as large deviations, unformed, and unreasonable construction period data
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0106] Embodiments of the present invention will be described in detail below.
[0107] The construction method under the general control period of the new construction system of high-rise residential buildings includes the following steps:
[0108] Foundation construction, duration of foundation construction T a The control is completed within 60 days to 210 days;
[0109] The construction period T from the foundation cushion to the positive and negative zero construction, and the foundation cushion to the positive and negative zero construction b The control is completed within 40 days to 76 days;
[0110] The construction of the main structural layer of the N-story, the construction period of the main structural layer of the N-story is T ci The control is completed within 5 to 12 days;
[0111] Construction of N-1 layer of formwork removal layer, construction period T of N-1 layer of formwork removal construction layer 1 The control is completed within 5 to 6 days;
...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com