Fracturing method for reservoirs based on schistose propping agents and gas wetting reversal agents
A wetting reversal and proppant technology, applied in the field of reservoir fracturing, can solve the problems of decreased conductivity of coalbed methane, poor effect, and reduction of seepage channels, etc., and achieves improved conductivity, increased flow channels, The effect of increasing production
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] This embodiment is coal seam hydraulic fracturing, such as Figure 4 As shown, the gas-wetting reversal agent is added to the pre-fluid of the water tanker 9, and the sheet-like proppant is mixed with the sand-carrying fluid and the pre-fluid in the pump truck 10 to form a fracturing fluid, and the coal seam is fracturing through the wellbore 13. Hydraulic fracturing, forming a plurality of fracturing fractures 12 . After determining the target coal seam, the average hydraulic fracturing displacement of CBM Vertical Well 11 is 8-10m 3 / min, the amount of fracturing fluid is determined according to the scale of the site, the ratio of pre-fluid and sand-carrying fluid is about 1:1, and 0.1% of the total weight of the fracturing pre-fluid is added to the fracturing pre-fluid. According to the site conditions, choose 0.01% concentration of sodium lauryl sulfate to add to the pre-fluid to promote the fracturing hydraulic pressure to enter the soft coal seam and crush the co...
Embodiment 2
[0053] The gas wetting reversal agent is added to the pre-fluid of the water tanker, and the coal gangue sheet-like proppant is mixed with the sand-carrying fluid and the pre-fluid in the pump truck to form a fracturing fluid, and the coal seam is hydraulically fractured through the wellbore. Multiple fractures are formed. After determining the target coal seam, the average hydraulic fracturing displacement of the CBM vertical well is about 8m 3 / min, the amount of fracturing fluid is determined according to the scale of the site, the ratio of pre-fluid and sand-carrying fluid is about 1:1, and 0.01% of the total weight of the fracturing pre-fluid is added to the fracturing pre-fluid. According to the site conditions, choose 1% sodium lauryl sulfate to add to the pre-fluid to promote the fracturing hydraulic pressure to enter the soft coal seam and crush coal, and reduce the pump pressure; if the total pre-fluid is 1000m 3 Then you need to use about 100kg sodium lauryl sulfat...
Embodiment 3
[0055] The gas wetting reversal agent is added to the pre-fluid of the water tanker, and the coal gangue sheet-like proppant is mixed with the sand-carrying fluid and the pre-fluid in the pump truck to form a fracturing fluid, and the coal seam is hydraulically fractured through the wellbore. Multiple fractures are formed. After determining the target coal seam, the average hydraulic fracturing displacement of the CBM vertical well is about 10m 3 / min, the amount of fracturing fluid is determined according to the scale of the site, the ratio of pre-fluid and sand-carrying fluid is about 1:1, and 0.0001% of the total weight of the fracturing pre-fluid is added to the fracturing pre-fluid. According to the site conditions, 10% sodium lauryl sulfate is added to the pre-fluid to promote the fracturing hydraulic pressure into the soft coal seam and crush the coal, and reduce the pump pressure; if the total pre-fluid is 1000m 3 Then you need to use about 100kg of sodium lauryl sulf...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com