Method for planting rice by sand
A rice and sandy soil technology, applied in the fields of botanical equipment and methods, rice cultivation, planting substrates, etc., can solve the problems of poor air permeability, inability to store nutrients well, and inability to form organic links between plants and groundwater, and improve the form , fix the desertification problem, solve the effect of easy movement of sand
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0020] 1) Selection of rice variety: choose a drought-resistant and lodging-resistant rice variety Luhan No. 1;
[0021] 2) Production of planting ponds: Excavate a planting pond with a length×width×depth of 100m×100m×1m in the sandy land, and set a field ridge with a length×width of 100m×1m between the planting ponds;
[0022] 3) Field ridge setting: Lay biodegradable plastic film on the edge of the field ridge slope, spray 500ml / mu of sand-fixing agent on the surface of the field ridge, and set up a straw wall as a windbreak;
[0023] 4) Laying of anti-seepage layer: first lay anti-seepage water sand with a thickness of 15mm on the surface of the planting pond, and then lay an agricultural water-retaining agent with a thickness of 8mm on the anti-seepage water and sand to form an anti-seepage layer;
[0024] 5) Nutrient layer laying: lay 80mm thick earthworm-fermented sludge on the anti-seepage layer (the sludge can pass the patent No. 201210036053.X, and the name is an inve...
Embodiment 2
[0029] 1) Selection of rice variety: choose a drought-resistant and lodging-resistant rice variety Luhan No. 1;
[0030] 2) Production of planting ponds: Excavate a planting pond with a length×width×depth of 100m×100m×1m in the sandy land, and set a field ridge with a length×width of 100m×1m between the planting ponds;
[0031] 3) Field ridge setting: Lay biodegradable plastic film on the edge of the field ridge slope, spray 500ml / mu of sand-fixing agent on the surface of the field ridge, and set up a straw wall as a windbreak;
[0032] 4) Laying of anti-seepage layer: first lay 20mm thick anti-seepage water and sand on the surface of the planting pond, and then lay 10mm thick agricultural water-retaining agent on the anti-seepage water and sand to form an anti-seepage layer;
[0033] 5) Laying of the nutrient layer: first lay 100mm thick earthworm fermented sludge on the anti-seepage layer, and then lay a 22mm thick light-duty soilless seedling-raising substrate for rice seed...
Embodiment 3
[0038] 1) Selection of rice variety: choose drought-resistant and lodging-resistant rice variety Hanyou 3;
[0039] 2) Production of planting ponds: Excavate a planting pond with a length×width×depth of 100m×100m×1m in the sandy land, and set a field ridge with a length×width of 100m×1m between the planting ponds;
[0040] 3) Field ridge setting: Lay biodegradable plastic film on the edge of the field ridge slope, spray 500ml / mu of sand-fixing agent on the surface of the field ridge, and set up a straw wall as a windbreak;
[0041] 4) Laying of anti-seepage layer: first lay 10mm thick anti-seepage water sand on the surface of the planting pond, and then lay 5mm thick agricultural water-retaining agent on the anti-seepage water sand to form an anti-seepage layer;
[0042] 5) Laying of the nutrient layer: first lay 50mm thick earthworm fermented sludge on the anti-seepage layer, and then lay a 18mm thick light-duty soilless seedling-raising substrate for rice seedlings on the fe...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com