Wellhead position correction method
A technology of well frame and well frame, applied in construction, artificial island, infrastructure engineering and other directions, can solve the problems of non-parallel position and paving direction, waste of paving materials, non-parallel pavement, etc., to save road pavement effect of material
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The specific implementation manners of the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0026] combine Figure 1 to Figure 4 As shown, the method for correcting the wellhead position of a specific embodiment of the present invention is schematically shown, including the following steps:
[0027] Step S1, measure the reference width B of the new well frame base 1, specifically, measure the distance between a pair of opposite corners of the original rectangular well frame 2 in the width direction W of the road pavement 3; measure the reference width B of the new well frame base 1 The length A, specifically, measures the distance between another pair of diagonal corners of the original rectangular well frame 2 in the length direction L of the pavement pavement ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com