PE pipe production process
A production process and pipe material technology, applied in the field of PE production, can solve the problems of low quality of finished products, high energy consumption of production process, etc., and achieve the effect of good quality of finished products and energy saving of production process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0015] The preferred embodiments of the present invention will be described in detail below in conjunction with the present invention.
[0016] A PE production process includes cleaning equipment, equipment inspection, starting the extruder, opening the cooling water of the cooling water tank, vacuum sizing, cooling and shaping, and pipe cutting.
[0017] During the test, when each section is heated, it should be heated in stages, that is, the temperature of each section should be heated to 120°C first, and then heated to 160°C, kept at constant temperature for 15 minutes, and finally heated to the process temperature.
[0018] After the temperature of each section reaches the process temperature, keep the temperature constant for at least 30 minutes, and continue to extrude for 15 minutes after the die starts to discharge, exhaust the gas in the original empty screw, stop extrusion, and prepare to start up. When using the PP-R production line to start up, it is necessary to c...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com