Construction method for building a multilayer underground space under existing building group
A technology of underground space and construction method, applied in construction, building maintenance, building construction, etc., can solve problems such as land shortage, achieve the effect of solving land shortage and improving land utilization rate
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0024] A construction method for adding a multi-storey underground space under an existing building complex proposed by the present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.
[0025] In the first stage, the structural inspection of the existing buildings should be carried out, the quality and reliability of the existing buildings should be demonstrated and the bearing capacity of the old structures should be evaluated, and the original buildings should be reinforced according to the evaluation results to make their structural strength Able to meet the requirements of subsequent construction.
[0026] Phase 2: Please refer to figure 1 , the underpinning pile 2 and the uplift pile 3 are both bored cast-in-situ piles, the underpinning pile 2 can meet the weight of each layer of the main building and the basement, and the pullout force is passed through the uplift pile 3 and the static pressure of th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com