Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Real-time flood control risk analytic calculation method for parallel reservoir group

A calculation method and technology for reservoir groups, which are applied in the field of real-time flood control risk analysis and calculation of parallel reservoir groups, can solve the problems of insufficient versatility, difficulty in obtaining a joint probability density distribution function of multi-dimensional uncertainty factors, and low calculation efficiency, and are easy to implement. , strong versatility, high computational efficiency

Active Publication Date: 2018-03-16
HOHAI UNIV
View PDF5 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, the existing risk assessment methods for real-time flood control operation of reservoir groups mainly have the following shortcomings: (1) It is difficult to obtain the joint probability density distribution function of multi-dimensional uncertain factors; (2) The random simulation method is used to calculate the risk of real-time flood control operation of reservoir groups, Calculation efficiency is not high, versatility is not enough, and different systems need to be re-modeled

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Real-time flood control risk analytic calculation method for parallel reservoir group
  • Real-time flood control risk analytic calculation method for parallel reservoir group
  • Real-time flood control risk analytic calculation method for parallel reservoir group

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] In order to further illustrate the technical solutions disclosed in the present invention, a detailed description will be given below in conjunction with the drawings and specific embodiments of the specification.

[0035] The present invention comprehensively considers the uncertainty of the inflow flow process of the reservoir group, the uncertainty of the outflow process of the reservoir group, and the uncertainty of the interval flood forecast process, and considers the correlation between uncertain factors, and establishes it through the Copula function theory Based on the joint probability density distribution function of the above uncertain factors, the definition of the real-time flood control dispatch risk of the reservoir group is proposed, and the analytical calculation formula of the real-time flood control dispatch risk of the reservoir group is obtained at each time.

[0036] Such as figure 1 As shown, a real-time flood control risk analysis calculation me...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a real-time flood control risk analytic calculation method for a parallel reservoir group. The method comprises the following steps that: (1) establishing a mathematical expression of an uncertainty factor to obtain the edge distribution function of the uncertainty factor; (2) on the basis of a Copula function, solving the joint probability density distribution function ofthe multidimensional uncertainty factor; (3) establishing the real-time flood control regulation risk model of the reservoir group, and analyzing the flood control dispatching risk of the reservoir group of each moment; and (4) calculating the real-time flood control regulation risk of the reservoir group. By use of the method, the influence of correlation between uncertainty factors for the real-time flood control regulation risk of the reservoir group is considered, the analytic calculation formula of the real-time flood control dispatching risk of the reservoir group of each moment is solved, and the method is high in calculation efficiency, easy in implementation and high in universality.

Description

technical field [0001] The invention belongs to reservoir flood control scheduling risk assessment, in particular to a real-time flood control risk analysis and calculation method for parallel reservoir groups. Background technique [0002] Real-time flood control scheduling of reservoir groups is one of the important technical means for flood control and disaster reduction in river basins. It can improve the efficiency of flood control projects with a small investment. However, there are many uncertain factors in the real-time flood control dispatching process of the existing reservoir groups, including the uncertainty of the inflow flow process of the reservoir group, the uncertainty of the outflow process of the reservoir group, and the uncertainty of the interval flood forecast process. These uncertain factors lead to the uncertainty of the combined flow process of downstream public flood control points, which has a certain impact on flood control decision-making and has...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/06
CPCG06Q10/0635G06Q50/06Y02A10/40
Inventor 陈娟钟平安徐斌张宇闫海滨李映辉
Owner HOHAI UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products