Semi-automatic block railway steel rail breaking monitoring system and method
A technology of semi-automatic blocking and monitoring system, which is applied in the field of rail breaking monitoring system, semi-automatic blocking railway rail breaking monitoring system, and semi-automatic blocking railway rail breaking monitoring field, which can solve the problem of increasing detection distance, increasing transmitter power, and battery-powered equipment. Disadvantages and other problems to achieve the effect of improving reliability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0127] See figure 1 , figure 2 The present invention discloses a semi-automatically blocked railway rail breakage monitoring system. The monitoring system is provided with at least one monitoring section, and each monitoring section is provided with monitoring equipment.
[0128] Each set of monitoring equipment adopts a dual redundancy method, which is divided into main use and backup. If one set of equipment fails, the backup equipment will be automatically put into use, and an audible and visual alarm will be issued to indicate the failure of the field equipment.
[0129] The monitoring equipment includes a DC power supply, a monitoring host, an information acquisition module, and a GPRS data transmission module; the monitoring host is respectively connected to the DC power supply, an information acquisition module, and a GPRS data transmission module.
[0130] The information collection module includes several rail DC resistances, several rail short-circuit lines, circuit protec...
Embodiment 2
[0171] The broken track monitoring system is a system suitable for non-electrified semi-automatic block sections and can monitor the integrity of the track connection in the measured section in real time. It can actually detect and analyze abnormal data of track connection integrity, and issue an alarm in time.
[0172] Semi-automatically blocked section interval rail break monitoring requires the rail as a wire to ensure that each rail passes a certain current. When the rail breaks, the loop current is cut off and an alarm message is sent.
[0173] The section to be semi-automatically blocked is generally about 8Km, and a monitoring section is set up. A power transmission terminal is installed outside the insulated joint of the track circuit at a distance of 1200 meters to 1400 meters outside the incoming signal, and the incoming signal is in the adjacent station. A short-circuit line is installed near the outer side of the track circuit insulation joint at a distance of 1200 mete...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com