New-concept railway safety dead end
A technology of railway safety and new concept, applied in the field of the end line, can solve the problems of long occupied track length, poor vehicle adaptability, complex structure, etc., and achieve the effect of short length, strong adaptability and simple structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0012] The structure of the first embodiment is as attached figure 2 As shown, the arresting pile 1 is connected to the moving rail 3, one end of the rail bridge 2 is connected to the static rail 6, and the other end and the moving rail 3 are in contact with each other, and can slide relative to each other and are attached to each other in parallel.
[0013] The working principle is that when the vehicle 4 collides with the arresting pile 1, the arresting pile 1 will drive the moving rail 3 to move together with the vehicle 4. The upper part of the moving rail 3 carries the gravity of the vehicle 4, and the lower part is the sleeper 5, so when the moving rail 3 When sliding on the sleeper 5, there will be a great frictional resistance, and this resistance will in turn be transmitted to the vehicle 4 through the blocking pile 1, causing the vehicle 4 to decelerate and stop quickly, avoiding the occurrence of derailment accidents. The main function of the rail bridge 2 is to ac...
Embodiment 2
[0014] The structure of the second embodiment is as attached image 3 As shown, the arresting pile 1 is connected to the moving rail 3, one end of the rail bridge 2 is connected to the moving rail 3, and the other end and the static rail 6 not only contact each other, but also slide relative to each other, and abut against each other in parallel.
[0015] The working principle is the same as that of the first embodiment.
Embodiment 3
[0016] The structure of the third embodiment is as attached Figure 4 As shown, the arresting pile 1 is connected to the moving rail 3, and the rail bridge 2 is fixedly installed on the sleeper 5, and abuts against the moving rail 3 and the static rail 6 in parallel with each other, respectively.
[0017] The working principle is the same as that of the first embodiment.
PUM
![No PUM](https://static-eureka-patsnap-com.libproxy1.nus.edu.sg/ssr/23.2.0/_nuxt/noPUMSmall.5c5f49c7.png)
Abstract
Description
Claims
Application Information
![application no application](https://static-eureka-patsnap-com.libproxy1.nus.edu.sg/ssr/23.2.0/_nuxt/application.06fe782c.png)
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com