Novel asphalt for water penetrating pavement and preparation method thereof
A new type of asphalt technology, applied in building components, building insulation materials, construction and other directions, can solve the problems of high price, small surplus, large amount of addition, etc., and achieve low material cost, high market competitiveness and low price. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0016] A new type of asphalt for water seepage pavement, which is composed of the following components in parts by weight: 6 parts of granular SBS modifier, 3 parts of resin, 3 parts of antiaging agent, 0.15 part of sulfur, and the balance is added with matrix leach to 100 parts.
[0017] The preparation method of above-mentioned novel asphalt of water seepage pavement: comprise the following steps:
[0018] 1) Add granular SBS modifier and resin to the base bitum at 170-185 degrees Celsius;
[0019] 2) Put it into a high-speed shear colloid mill for 30 minutes to obtain substance A;
[0020] 3) Put substance A into a transition tank, add anti-aging agent and stabilizer, stir for 2.5 hours, keep warm at 175-185 degrees Celsius for 1-3 hours, and you get it;
[0021] 4) Detect the indicators of high viscosity modified asphalt.
Embodiment 2
[0023] A new type of asphalt for water seepage pavement, which is composed of the following components in parts by weight: 8 parts of granular SBS modifier, 5 parts of resin, 5 parts of anti-aging agent, 0.2 part of stabilizer, and the balance added with base leaching to 100 parts .
[0024] The preparation method of above-mentioned novel asphalt of water seepage pavement: comprise the following steps:
[0025] 1) Add granular SBS modifier and resin to the base bitum at 170-185 degrees Celsius;
[0026] 2) Put it into a high-speed shear colloid mill for 30 minutes to obtain substance A;
[0027] 3) Put substance A into a transition tank, add anti-aging agent and stabilizer, stir for 2.5 hours, keep warm at 175-185 degrees Celsius for 1-3 hours, and you get it;
[0028] 4) Detect the indicators of high viscosity modified asphalt.
[0029] In the present invention, specifically, the stabilizer is sulfur.
Embodiment 3
[0031] A new type of asphalt for water seepage pavement, which is composed of the following components in parts by weight: 7 parts of granular SBS modifier, 4 parts of resin, 4 parts of anti-aging agent, 0.2 part of stabilizer, and the balance added with base leaching to 100 parts .
[0032] The preparation method of above-mentioned novel asphalt of water seepage pavement: comprise the following steps:
[0033] 1) Add granular SBS modifier and resin to the base bitum at 170-185 degrees Celsius;
[0034] 2) Put it into a high-speed shear colloid mill for 30 minutes to obtain substance A;
[0035] 3) Put substance A into a transition tank, add anti-aging agent and sulfur, stir for 2.5 hours, keep warm at 175-185 degrees Celsius for 1-3 hours, and you get it;
[0036] 4) Detect the indicators of high viscosity modified asphalt.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com