Bag reserved tunnel active roof-contacting room and pillar type pillar stoping method
A technology for reserving roadways and capsules, which is used in surface mining, mining equipment, earth-moving drilling, etc., can solve the problems of complex mining process, low mining efficiency, and high mining cost, and achieve simple process, low filling cost, and saving The effect of picking time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] The embodiments of the present invention will be described in detail below with reference to the accompanying drawings, but the present invention can be implemented in various ways defined and covered below.
[0031] figure 1 It is a flow chart of the mine pillar recovery method of the capsule reserved roadway actively connected to the roof pillar method in the preferred embodiment of the present invention; figure 2 It is a schematic diagram of the distribution structure of filling capsules and filling bodies in the empty space in the preferred embodiment of the present invention; image 3 It is a structural schematic diagram of pillar mining in the goaf in a preferred embodiment of the present invention.
[0032] Such as figure 1 As shown, the capsule body reserved roadway of the present embodiment actively connects the roof pillar method ore pillar recovery method, comprising the following steps: a, according to the distribution of the ore pillar 1 and the empty ar...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com