Construction method of full-section excavation of conglomerate type V surrounding rock diversion and flood discharge scouring tunnel in the western region
A construction method and full-section technology, which is applied in sea area engineering, earthwork drilling, water conservancy engineering, etc., can solve the problems of difficult implementation, lagging progress of manual excavation, and difficult implementation of cemented and slightly dense tunnel sections, so as to achieve the goal of investing manpower The effect of less resources, fast digging progress, and low overall cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0019] A full-section excavation construction method for diversion and flood discharge scouring tunnels in Type V surrounding rocks of conglomerate in the Western Regions, comprising the following steps:
[0020] (1) According to the size of the excavation section in the design drawings, the laser guide is used to point, and the total station is used to stake out the tunnel face;
[0021] (2) The Western Region Conglomerate Type V surrounding rock in this embodiment is a micro-cemented dense sandy gravel layer, which is excavated at a full section without explosion, with a 0.2m thick protective layer reserved, excavated with an artificial pick, and the circular footage is 1.2m. After digging a circular footage, carry out initial support;
[0022] The initial support includes: a. installation of steel arches; b. hanging net; c. shotcrete.
[0023] a. Installing the steel arch includes the following steps:
[0024] 1) Measurement positioning
[0025] First measure the center ...
Embodiment 2
[0032] In this example, the Type V surrounding rock of conglomerate in the Western Regions is a micro-cemented and dense sandy gravel layer. Explosion-free full-section excavation is adopted, a 0.2m thick protective layer is reserved, and artificial pneumatic picks are excavated. The circular footage is 1m, and one excavation is carried out. After the circular footage, the initial support is carried out, and the distance between two adjacent steel arch frames is 1m. Other construction steps are identical with embodiment 1.
Embodiment 3
[0034] In this example, the Type V surrounding rock of conglomerate in the Western Regions is a micro-cemented and dense sandy gravel layer. Explosion-free full-section excavation is adopted, a 0.2m thick protective layer is reserved, and artificial pneumatic picks are excavated. The circular footage is 1.5m. After a cycle of footage, the initial support is carried out, and the distance between two adjacent steel arch frames is 1.5m. Other construction steps are identical with embodiment 1.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com