Separated dismantling and hoisting method for large-scale corbels used for high pier construction
A hoisting method and separate technology, which is applied in the direction of erecting/assembling bridges, bridge parts, bridges, etc., to achieve the effects of reducing danger, saving construction machinery, and speeding up the construction progress
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] The method of the present invention will be described in detail below in conjunction with the accompanying drawings.
[0025] figure 2 Shown is the flow chart of the method of the present invention. The specific process is as follows:
[0026] like image 3 As shown, before the separate disassembly of the corbel, a pair of tie beams 8 perpendicular to the tie beam are welded horizontally at the intersection of the vertical brace 2 of the corbel and the tie beam 5, and the two ends of the tie beam 8 protrude from the tie beam. Outside the two sides of the leg; use two pull rods 9 to connect the two ends of the tension beam on the two corbels respectively, and pull the pair of corbels on both sides of the high pier to each other;
[0027] When welding the tie beam at the junction of the vertical brace and the tie beam, if there is a gap between the tie beam 8 and the vertical brace 2 and the tie beam 5, then fill and weld the stiffener 10 in the gap.
[0028] Then re...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com