Synchronous construction method for horizontal and vertical structures of super high-rise building

A technology for vertical structures and high-rise buildings, which is applied to building structures, on-site preparation of building components, and construction. Effects of reducing weight, speeding up construction, and narrowing construction gaps

Active Publication Date: 2017-02-15
CHINA CONSTR EIGHT ENG DIV CORP LTD +2
View PDF3 Cites 16 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] 1. Since the steel platform is integrally fixed, the platform must be cut when encountering structural outrigger trusses and connecting beams, which increases the difficulty of construction, otherwise it will not be possible to construct related horizontal structures;
[0005] 2. Lattice columns must be embedded in the structure and cannot be recycled, resulting in waste of materials and affecting the construction of horizontal structures;
[0006] 3. The construction method usually used in the construction of super high-rise core tubes is: the vertical structure goes first, and the horizontal structure lags behind the vertical wall by more than 10 floors, resulting in a large gap between the vertical and horizontal structures, facing severe fire safety hazards and structural problems. Stress problem
Moreover, the safety protection at the bottom of the top formwork system is relatively difficult, and falling objects from high altitudes will bring serious safety hazards to the structural construction of the lower horizontal beam slab

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Synchronous construction method for horizontal and vertical structures of super high-rise building
  • Synchronous construction method for horizontal and vertical structures of super high-rise building
  • Synchronous construction method for horizontal and vertical structures of super high-rise building

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.

[0033] First, see Figure 3-5 As shown, the synchronous construction method of horizontal and vertical structures of a super high-rise building in the present invention mainly adopts a set of jacking and external climbing formwork construction platform composed of hydraulic climbing formwork system 11 and jacking platform system 12. , in order to realize the simultaneous construction of the horizontal structure and the vertical structure of super high-rise buildings, the core construction steps are as follows:

[0034] S001: Install a hydraulic climbing formwork system on the building wall outside the completed building. The hydraulic climbing formwork system includes a hydraulic climbing frame and a wall attachment device installed on the outer wall of the building wall for the hydraulic climbing frame to climb and attach;

[0035] ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a synchronous construction method for horizontal and vertical structures of a super high-rise building. According to the synchronous construction method, a hydraulic creeping formwork system is adopted on the outer wall of the super high-rise building, and a jacking platform system is adopted between two building walls on the inner side of the super high-rise building; when being operated at the same time, the two systems can replace a conventional overall jacking construction platform as a construction platform, thereby reducing the overall weight of a construction platform and the burden of a hydraulic jacking system, achieving higher flexibility, and improving the construction speed; as the light-weight jacking platform system is configured, a small-sized oil cylinder can be adopted; accordingly, no horizontal supporting steel beam is needed, oil cylinder climbing can be achieved as long as wall-attached embedded parts are mounted on the building walls, the total height of the construction platform and a supporting frame body can be reduced, the construction gap between the vertical and horizontal structures can be narrowed, and the construction of the horizontal structure can be prevented from being influenced by a hydraulic climbing system; and the jacking platform system adopted on the inner wall of the super high-rise building is prevented from penetrating through the building walls, and the gap between the construction platform and a reinforcing bar colligation operation surface is equal to the height of one floor, thereby achieving convenient reinforcing bar transfer and colligation.

Description

technical field [0001] The invention relates to the field of super high-rise building construction, in particular to a method for synchronously constructing horizontal and vertical structures of super high-rise buildings. Background technique [0002] In the reinforced concrete construction of walls, core tubes, chimneys, water towers and other buildings of high-rise buildings, the overall lifting steel platform scaffolding system is mostly used. Cooperate figure 1 and figure 2 As shown, the system is supported by the support column (lattice column) inserted in the wall, powered by the elevator, the main beam is made of large-section H-shaped steel, and the formwork and scaffolding system are hung below. A closed operating platform with a certain bearing capacity is formed on the operating surface of the core tube. [0003] However, the overall lifting cylinder platform scaffolding system has the following defects: [0004] 1. Since the steel platform is integrally fixe...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04B1/00E04B1/16E04G11/28
CPCE04B1/00E04B1/161E04G11/28
Inventor 唐际宇林忠和戈祥林唐阁威梁月利罗逸锋宁华宏
Owner CHINA CONSTR EIGHT ENG DIV CORP LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products