Quick boarding system used for port passenger ship
A passenger ship and boarding technology, which is applied to ship accessories, passenger processing equipment, ships, etc., can solve the problems of passengers getting on and off the ship, and achieve the effect of comfortable getting on and off the ship, wide adaptability and high reliability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach
[0013] The fast boarding system for port passenger ships of the present invention, its preferred embodiment is:
[0014] It includes a lifting platform, a movable corridor bridge is provided between the lifting platform and the wharf platform, and a boarding corridor is provided between the lifting platform and the cabin door of the passenger ship. The vertical slideway is fixed, and the main structure of the lifting platform is composed of a steel floating box or a concrete floating box or adopts a lightweight structure.
[0015] The movable corridor bridge is hinged with the wharf platform, and overlapped with the lifting platform through the left limit sliding support and the right limit sliding support.
[0016] The movable interface includes a plurality of expansion joints, which are connected in series by cables, one end of which is fixed on the lifting platform, and the other end is movable, and the movable end is connected to the ship hatch when in use;
[0017] The c...
specific Embodiment
[0026] Such as Figure 1 to Figure 5 As shown, the system consists of a movable corridor bridge, a lifting platform, and a boarding corridor. The movable corridor bridge and the boarding corridor are all fully enclosed; Seat overlap; the lifting platform adopts an embedded layout, fixed by positioning piles (or vertical slides), limiting horizontal displacement, and can be lifted and lowered synchronously with the water level; the boarding corridor is scalable and universally rotatable, one end It is fixed on the lifting platform, and the other end is connected to the cabin door. When the passenger ship needs to be unmoored, the boarding corridor is disconnected from the cabin door.
[0027] According to the number of passengers and transfer efficiency, multi-hatch passages and upper and lower double-deck passages are designed. The hatch layout of the passenger ship is correspondingly built.
[0028] Lifting platform layout: Embedded lifting platform is adopted. The main str...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com