Method for ecological restoration of high-altitude slope
An ecological restoration and high-altitude technology, applied in the direction of soil preparation methods, applications, agricultural machinery and tools, etc., can solve the problems of secondary slope damage, poor effect, slope collapse, etc., to reduce water evaporation and restore good effect , The effect of reducing construction costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0024] In an embodiment of the present invention, a method for ecological restoration of a high-altitude slope comprises the following steps:
[0025] 1) Slope surface cleaning: Remove debris on the high-altitude slope surface, including pumice and floating soil, and level the slope surface.
[0026] 2) Anchor rod construction: mark the position of the anchor rod and carry out drilling operations. The diameter of the anchor hole is 30mm, the depth of the anchor hole is 400mm, the distance between the anchor holes is 0.8m*0.8m, the diameter of the anchor rod to be installed is 10mm, the length of the anchor rod is 400mm, and the slope surface is prefabricated. Leave the anchor rod length 5cm, bend the top of the anchor rod, and pour anchoring agent to fix it.
[0027] 3) Hanging net: Lay reinforced net on the side slope surface in step 2), and fix it on the reserved anchor rod on the side slope surface. The reinforced mesh is PVC-coated steel wire mesh, mesh size: 60*80mm, ten...
Embodiment 2
[0033] In an embodiment of the present invention, a method for ecological restoration of a high-altitude slope comprises the following steps:
[0034] 1) Slope surface cleaning: Remove debris on the high-altitude slope surface, including pumice and floating soil, and level the slope surface.
[0035] 2) Anchor rod construction: mark the position of the anchor rod and carry out drilling operations. The diameter of the anchor hole is 35mm, the depth of the anchor hole is 600mm, the distance between the anchor holes is 1.2m*1.2m, the diameter of the anchor rod to be installed is 14mm, the length of the anchor rod is 600mm, and the slope surface is prefabricated. Leave the length of the anchor rod 10cm, bend the top of the anchor rod, and pour anchoring agent to fix it.
[0036] 3) Hanging net: Lay reinforced net on the side slope surface in step 2), and fix it on the reserved anchor rod on the side slope surface. The reinforced mesh is PVC-coated steel wire mesh, mesh size: 60*8...
Embodiment 3
[0042] In an embodiment of the present invention, a method for ecological restoration of a high-altitude slope comprises the following steps:
[0043] 1) Slope surface cleaning: Remove debris on the high-altitude slope surface, including pumice and floating soil, and level the slope surface.
[0044] 2) Anchor construction: mark the location of the anchor and carry out drilling operations. The diameter of the anchor hole is 32mm, the depth of the anchor hole is 500mm, the distance between the anchor holes is 1m*1m, the diameter of the installed anchor is 12mm, the length of the anchor is 500mm, and the anchor is reserved on the slope surface The length of the rod is 8cm, the top of the anchor rod is bent, and the anchoring agent is poured for fixation.
[0045] 3) Hanging net: Lay reinforced net on the side slope surface in step 2), and fix it on the reserved anchor rod on the side slope surface. The reinforced mesh is PVC-coated steel wire mesh, mesh size: 60*80mm, tensile s...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com