Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

System and method for managing railway bridge construction progress based on 3DGIS (Three-dimensional Geographic Information System) and engineering three-dimensional model

A technology for bridge construction and progress management, applied in the field of informatization, can solve the problems of low degree of automation of data collection, inconvenient data statistical analysis, and inconvenient progress display, so as to reduce the workload of input, reduce the workload of statistical analysis, The effect of reducing labor intensity

Pending Publication Date: 2017-01-18
CHINA RAILWAY DESIGN GRP CO LTD
View PDF4 Cites 33 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the display and management of bridge construction progress in my country mainly adopt reports and two-dimensional graphics. The standardization and automation of data collection in this way are low, the current situation is poor, the data granularity is coarse, and there are difficulties in data collection and inconvenient statistical analysis of data. The progress display is not visually intuitive and other issues

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • System and method for managing railway bridge construction progress based on 3DGIS (Three-dimensional Geographic Information System) and engineering three-dimensional model
  • System and method for managing railway bridge construction progress based on 3DGIS (Three-dimensional Geographic Information System) and engineering three-dimensional model
  • System and method for managing railway bridge construction progress based on 3DGIS (Three-dimensional Geographic Information System) and engineering three-dimensional model

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041] The management system and management method of the present invention will be described in detail below in conjunction with the accompanying drawings.

[0042] like figure 1 As shown, the railway bridge construction progress management system based on 3DGIS and engineering three-dimensional model of the present invention includes: user management module, actual progress data acquisition module, construction plan module, three-dimensional image progress display module, statistical analysis module and log recording module.

[0043] The user management module is used for user login, logout, personnel management and authority configuration. in:

[0044] User login means that the user enters the user name and password to log in to the system. Illegal accounts cannot log in to the system. The system searches from the database user table according to the user name and password entered by the user. If the match is successful, the system is logged in;

[0045] Logout means that...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a system and a method for managing railway bridge construction progress based on a 3DGIS (Three-dimensional Geographic Information System) and an engineering three-dimensional model. The system comprises a user management module, an actual progress data collecting module, a construction and organization plan module, a three-dimensional image progress display module, a statistic analysis module, a progress early-warning module and a log record module, wherein the actual progress data collecting module has the functions of data filling and reporting, data auditing and storing; the construction and organization plan module is used for making and inputting a work point construction and organization plan; the three-dimensional image display module has the functions of three-dimensional image leading-in, bridge work point model leading-in, three-dimensional navigating and progress display; the statistic analysis module is used for carrying out statistic analysis on progress data and outputting a statistical form; the progress early-warning module has the functions of early-warning personnel allocation and short message reminding; the log record module is capable of recording user login information, progress filling and reporting information and audit information in real time. According to the system and the method, disclosed by the invention, refined and three-dimensional visual management of railway bridge construction progress can be realized.

Description

technical field [0001] The invention belongs to the information technology field of railway and urban rail transit construction, and specifically relates to a railway bridge construction progress management system and management method based on 3DGIS and engineering three-dimensional models. Background technique [0002] With the rapid development of railway infrastructure construction, a large number of large and extra-large bridges are constantly under construction, especially in the construction of high-speed railways. Considering factors such as environment, land, maintenance and repair, the proportion of bridges is increasing. At present, the display and management of bridge construction progress in my country mainly adopt reports and two-dimensional graphics. The standardization and automation of data collection in this way are low, the current situation is poor, the data granularity is coarse, and there are difficulties in data collection and inconvenient statistical a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/30G06T17/05G06Q10/06G06Q50/08
CPCG06F16/29G06Q10/0631G06Q50/08G06T17/05
Inventor 宁新稳韩祖杰王华赵文刘小龙范登科王娇黄漪
Owner CHINA RAILWAY DESIGN GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products