Method for determining grouting amount for filling karst caves along shield tunnel in karst stratum
A technology of shield tunneling and determination method, applied in construction and other directions, can solve the problems of inability to determine the volume of karst caves, difficulty in measuring construction operations, and long time consumption.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0053] The present invention will be described in detail below in conjunction with specific embodiments. The following examples will help those skilled in the art to further understand the present invention, but do not limit the present invention in any form. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present invention. These all belong to the protection scope of the present invention. Operations that are not specifically described in this embodiment can be performed with reference to the methods already provided in the Summary of the Invention, and will not be repeated here.
[0054] The following is an embodiment of a method for determining the volume of a regional karst cave in a covered karst area.
[0055] A rail transit project is located in Guangzhou City, where covered karst is widely distributed, and the ground along the tunnel is urban traffic arterial roads, residential...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com