Water -free pebble back to fill the strata shield wall structure and grouting material
A grouting material and shield wall technology, applied in the field of grouting materials, can solve the problems of segment misplacement, uneconomical, fast slurry diffusion, etc., so as to control segment misplacement, save economic costs, and speed up initial setting time. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0017] The anhydrous pebble backfills the grouting material behind the stratum shield wall in this embodiment, and the raw material of the grouting material includes 10% fly ash, 2% lime, 0.5% bentonite, and 54% stone chips by weight percentage, The balance is water added to 100%.
Embodiment 2
[0019] The anhydrous pebble backfills the grouting material behind the shield wall of the stratum in this embodiment, and the raw material of the grouting material includes 16% fly ash, 3.2% lime, 4.5% bentonite, and 57% stone chips by weight percentage, The balance is water added to 100%.
Embodiment 3
[0021] The grouting material for backfilling the formation shield wall with anhydrous pebbles in this embodiment, the raw materials of the grouting material include 10% fly ash, 3.2% lime, 0.5% bentonite, and 57% stone chips by weight percentage, The balance is water added to 100%.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com