Mine combined type water draining and contamination draining system and method
A sewage system and combined technology, used in drainage, mining equipment, earth-moving drilling, etc., can solve the problem that the drainage and sewage method cannot meet the requirements of "water inrush" in the mine, saving installation time, simple and convenient transportation, The effect of strong mobility
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] Such as figure 1 , 2 As shown, a combined drainage and sewage system suitable for mine "water inrush" disasters is composed of a plurality of drainage units 1 connected in series or in parallel; each set of drainage units 1 includes a complete set that can work independently or The combined working submersible sewage pumps 2 each have an independent power supply system and a drainage pipeline 3 with a full lift.
[0027] Among them, in the normal operation of the submersible sewage pump 2, it is necessary to avoid parallel operation of different types of pumps to avoid low-efficiency operating points, and to avoid using gate valves to control flow as much as possible to avoid increasing throttling losses; the submersible sewage pump 2 should be Bottomless valve operation is adopted, that is, the bottom valve at the suction end of the water pump is cancelled, the air in the submersible sewage pump 2 is pumped out by a jet vacuum pump, and the submersible sewage pump 2 i...
Embodiment 2
[0035] Such as image 3 As shown, when the water gushing volume of the water inrush roadway at the disaster site is large, in order to further improve the drainage volume and drainage efficiency, multiple drainage systems in Embodiment 1 can be connected in parallel to perform joint drainage operations. The specific implementation steps are as follows:
[0036] According to the flooding condition of the water inrush roadway, estimate the drainage flow rate and lift required on site, design and calculate the parallel arrangement scheme of the drainage pipeline 3 and the number of parallel drainage units 1 required;
[0037] According to the design requirements, the drainage pipelines 3 are arranged in parallel in the wellbore 4, and at the same time, the submersible sewage pumps 2 are transported to the wellbore 4 for installation and fixing, and the drainage pipelines 3 of each branch are connected in series with the submersible sewage pumps 2 respectively. Connect to the mai...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com