Interconnected network standby shared capacity allocation method considering security constraints

A security constraint, backup sharing technology, applied in the field of power systems, can solve problems such as unanalyzed adjustability

Active Publication Date: 2016-11-09
NARI TECH CO LTD +4
View PDF4 Cites 18 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0009] The dynamic economic dispatch model proposed in Document 3 integrates the factors of electricity market and ancillary service market, and considers the demand for spare capacity for safe operation of the system under normal working conditions and N-1 working conditions. Similar to Document 2, this model solves the existing The problem of power purchase cost optimization above the demand for spare capacity, without analyzing the adjustable capacity under the current operating conditions of the power grid, cannot provide effective technical support for inter-provincial reserve capacity mutual aid under accident disturbances

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Interconnected network standby shared capacity allocation method considering security constraints
  • Interconnected network standby shared capacity allocation method considering security constraints
  • Interconnected network standby shared capacity allocation method considering security constraints

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0066] The present invention will be further described below in conjunction with the accompanying drawings. The following examples are only used to illustrate the technical solution of the present invention more clearly, but not to limit the protection scope of the present invention.

[0067] Considering the security constraints, the method for allocating spare shared capacity of the interconnected grid includes the following steps:

[0068] Step 1: Calculation of the available support capacity of the provincial grid based on the sensitivity and section safety constraints: Classify the generating units according to the active power sensitivity coefficients of the units in the province to the transmission section; consider the current operating status of the transmission section, the active output of the units and the adjustment performance, calculate The unit adjustment range that satisfies the safety constraints of the transmission section is used to calculate the maximum ava...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an interconnected network standby shared capacity allocation method considering security constraints, and belongs to the control field of electrical power systems. The interconnected network standby shared capacity allocation method comprises the following steps: using a provincial network adjustable capacity analysis method based on sensitivity analysis and cross-section margin so as to determine actually available support capacity of each member in a standby sharing group; on the basis of unit regulation performance and power transmission line available capacity, presenting an active support optimal allocation strategy considering provincial cross-section and inter-provincial interconnection line security constraints, and giving full play to the roles of an interconnected network in high-power loss disruption recovery under the precondition of guaranteeing transmission cross-section and interconnection line power transmission security through method improvement of fixed coefficient allocation loss power in control deviation of a dynamic area.

Description

technical field [0001] The invention relates to a method for allocating backup shared capacity of an interconnected power grid considering safety constraints, and belongs to the technical field of electric power systems. Background technique [0002] With the continuous increase of power received outside the power grid in some areas, the characteristics of the large receiving end power grid are becoming more and more obvious. Any DC commutation failure or unipolar or bipolar blocking failure will inevitably lead to a sharp drop in grid frequency. When a large disturbance occurs in the frequency of the interconnected grid, the recovery of the system frequency first depends on the primary and secondary adjustments of the system frequency. The inter-connection line plan is not corrected in real time according to the power loss of each control area, which will inevitably lead to a large reduction in output in the non-DC drop point control area and cause miscontrol, which is not ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): H02J3/48
CPCH02J3/001H02J3/48
Inventor 徐瑞高宗和戴则梅滕贤亮吴继平丁恰张小白于昌海
Owner NARI TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products