Dobby drill dill-rod lifter rubber sleeve and manufacturing method thereof
A technology of rubber sleeves and blocks, which is applied in the direction of drilling equipment, drill pipes, drill pipes, etc., can solve the problems of inconvenient purchase, short use and replacement cycle, and high cost of rubber sleeves for brazing devices, so as to save replacement labor and replacement cycle Long, simple structure and practical effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] Due to the backward development of the local area, there are no such accessories in the local area and neighboring countries, so the nearby purchase can only be given up. According to the observation and analysis of the brazing rubber sleeve, the accessory must be wear-resistant, tough and elastic, and can hold the drill pipe well on the boom of the drilling rig. After analysis, at this time the artificial aggregate production system on the construction site has replaced many scrapped conveyor belts, which happen to have properties such as wear resistance, toughness, and elasticity, and the conveyor belt contains multiple layers of fibers, which have better toughness and stability. Using the scrapped aggregate conveyor belt of the artificial aggregate production system, a durable and replaceable rubber sleeve for the brazing device was designed and manufactured, successfully turning waste into treasure.
[0031] Such as Figure 2-3 Shown, a kind of dobby drill brazing ...
Embodiment 2
[0047] Such as Figure 2-3 Shown, a kind of multi-arm drill supporting device rubber sleeve of the present invention, long 11cm (can determine the making size of supporting device rubber sleeve according to actual needs) before making the brazing device rubber sleeve, wide and high 8cm, the middle is the diameter 4cm hole. The scrap aggregate conveying width is 650cm~1000cm, and the thickness is 1.1~1.2cm. Cut the conveyor belts of different widths into 8cm×8cm aggregate conveyor belt block 1 with a shearing machine (you can also install the self-made blade on the four-post press to cut the strips); D=4cm) extrude the circular drill pipe through hole 2, open the mounting holes 3 (D=6mm) respectively with a four-column press at two corners on one side, and the distance between the center of the hole and the adjacent two sides is 1cm. When opening the hole, It is best to make a right-angle L-shaped card slot and fix the aggregate conveyor belt block 1 on the drilling machine t...
Embodiment 3
[0049] Such as Figure 2-3 Shown, a kind of preparation method of dobby drill propeller rubber sleeve, comprises steps:
[0050] Step 1, using the scrapped aggregate conveyor belt to cut and make the aggregate conveyor belt block 1;
[0051] Step 2, opening a drill pipe through hole 2 at the center of the aggregate conveyor belt block 1;
[0052] Step 3. Open a mounting hole 3 at two corners of one side of the aggregate conveyor belt block 1;
[0053] Step 4. Stack nine aggregate conveyor belt cubes 1, and use bolts 4 to connect and fix the superimposed aggregate conveyor belt cubes 1 in series through installation holes 3 to form a brazing device rubber sleeve.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com