Whole-course temporary blocking and fracturing method and application thereof
A fracturing, full-process technology, applied in the field of petroleum fracturing, can solve the problems of complex reconstruction process and tools, low operation efficiency, high construction risk, etc., and achieve the effect of technological advancement and obvious advantages
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0030] This embodiment provides a whole-process temporary plugging fracturing method, including fracturing and temporary plugging. During the fracturing process, temporary plugging materials in the fractures are added for full transformation. After the fracturing is completed, temporary plugging segments near the wellbore are injected. Realize temporary blocking.
[0031] The method of this embodiment is used in the fracturing construction process. During the fracturing process, temporary plugging materials in the fractures are added. The temporary plugging materials in the fractures can temporarily plug the gaps in various parts of the fractures. , run down the temporary plugging slug, and achieve temporary plugging in the near-well zone. After the temporary plugging, the fracturing of the next fracture can be carried out. After the surface reading, the setting tool is used for plugging, which simplifies the fracturing process and drilling tools, and ensures Improve the succe...
Embodiment 2
[0033] This example introduces in detail the full-process temporary plugging fracturing method used in hydraulic jet fracturing reconstruction.
[0034] The full-range temporary plugging fracturing method for hydraulic jet fracturing comprises the following steps:
[0035] Step 1: Perforate the first section, and perform fracturing after the first section is perforated. During the fracturing process, add temporary plugging materials in the fracture to fully reform. After the fracturing is completed, inject the temporary plugging section near the wellbore The plug realizes temporary blocking;
[0036] Step 2: Carry out the second stage of perforation and fracturing reconstruction in the same way as Step 1;
[0037] Step 3: By analogy, until the whole well reconstruction is completed, then close the well;
[0038] Step 4: Open the well and blowout after the temporary plugging material is degraded.
[0039] In this embodiment, the process is mainly reflected in layer-by-layer ...
Embodiment 3
[0041] This example introduces in detail the full-process temporary plugging fracturing method used in multi-stage combined pressure and flow-limited fracturing in thin interbeds.
[0042] The full-process temporary plugging fracturing method for multi-stage co-compression and flow-limited fracturing of thin interbeds includes the following steps:
[0043] Step 1: Perforating each stimulated interval;
[0044] Step 2: Firstly, the fracturing is the easiest layer to be fracturing, and the fracturing fluid selects the easiest layer to be fracturing first, and the temporary plugging material in the fracture is added during the fracturing process to fully fracturing. After the fracturing is completed, the injection near Temporary plugging is achieved with temporary plugging in the well;
[0045] Step 3: In the same way as in step 2, according to the difficulty of the reconstruction of the reconstruction interval, fracturing and reconstruction of other intervals in sequence from e...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com