Method for highway or railway to pass through large and medium congelifraction clastic flow areas
A kind of debris flow, large and medium-sized technology, which is applied in the field of highway or railway passing through large and medium-sized cold and freezing weathered debris flow areas to achieve the effect of convenient construction and reasonable structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] The implementation of the present invention will be described in detail below in conjunction with the accompanying drawings, but they do not constitute a limitation to the present invention, and are only examples. At the same time, the advantages of the present invention are clearer and easier to understand through the description.
[0018] Referring to the accompanying drawings, it can be seen that the method for road or railway to pass through large and medium-sized frozen weathered debris flow areas is characterized in that: it includes the following construction steps,
[0019] Step 1: Extend the area where the debris flow accumulation body is located to the outside of both sides of the debris flow accumulation body for 10-20m, and use the extended area as debris flow area 1, and determine that traffic engineering planning route 2 is in debris flow area 1 where you are;
[0020] Step 2: Arrange the first row of concrete column foundations 71 composed of multiple pr...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com