A prefabricated arch load-bearing type vegetation concrete slope greening system and its greening method
A vegetation concrete and arch technology, applied in the field of slope greening, can solve the problems of increasing seed germination rate and reducing the amount of vegetation concrete cement, etc., to achieve the effect of increasing germination rate, reducing self-stabilization requirements, and low overall cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] Embodiment one (an anchor rod is arranged on the initial design slope)
[0035] Such as figure 1 , figure 2 and image 3 As shown, a prefabricated arch load-bearing vegetation concrete slope greening system includes multiple rows of arch load-bearing devices laid along the slope surface;
[0036] The load-bearing device of the arch body includes a plurality of prefabricated arch bodies 1, and every two prefabricated arch bodies 1 are connected by a force-bearing pier 2, and each force-bearing pier 2 is built on the slope through anchor rods buried on the slope;
[0037] A reservoir 4 is installed on the top of the slope, and a plurality of vertically arranged multi-stage water supply devices 5 for watering the vegetation near the prefabricated arches 1 communicate with the reservoir 4;
[0038] In the multi-stage water supply device 5, one end of the main pipe 9 communicates with the reservoir 4, and the main pipe 9 passes through each prefabricated arch body 1 of e...
Embodiment 2
[0046] Embodiment two (no anchor rod on the initial design slope)
[0047] A method for slope greening using the above-mentioned prefabricated arch load-bearing type vegetation concrete slope greening system, the method includes the following steps:
[0048] 1) Clean up the slope surface, and clean up the heavily weathered rock and soil mass and sundries on the slope surface;
[0049] 2) Bury multiple anchor rods on the slope surface, the length of the anchor rods is 2 meters, the diameter is 28-30 mm, and the angle between the anchor rods and the slope surface is 15-20 degrees;
[0050] 3) Build multiple stressed piers 2 at the end of the slope where the anchor bar is exposed;
[0051] 4) Install multiple arches 1 to form multiple rows of arch load-bearing devices;
[0052] 5) A reservoir 4 is installed on the top of the slope, and multiple vertically arranged multi-level water supply devices 5 for watering the vegetation near the prefabricated arches 1 are connected to the...
Embodiment 3
[0056] Embodiment 3 (Anchor rods are provided on the initial design slope)
[0057] A method for slope greening using the above-mentioned prefabricated arch load-bearing type vegetation concrete slope greening system, the method includes the following steps:
[0058] 1) Clean up the slope surface, and clean up the heavily weathered rock and soil mass and sundries on the slope surface;
[0059] 2) Build multiple stressed piers 2 at the end of the slope where the anchor bar is exposed;
[0060] 3) Install multiple arches 1 to form multiple rows of arch load-bearing devices;
[0061]4) A reservoir 4 is installed on the top of the slope, and multiple vertically arranged multi-stage water supply devices 5 for watering the vegetation near the prefabricated arches 1 are connected to the reservoirs 4 to complete the load-bearing vegetation concrete slope of the prefabricated arches Installation of greening system;
[0062] 5) On the prefabricated arch load-bearing vegetation concre...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com