A kind of supporting equipment and using method of bridge prefabricated hollow slab side form

A technology of support equipment and hollow boards, which is applied in the direction of manufacturing tools, mold fixtures, mold auxiliary parts, etc., can solve the problems of cumbersome construction procedures, wood chips, human body and environmental hazards, and heavy formwork workload, so as to avoid wooden wedges The use of square wood, strong controllability and randomness, and the effect of safe and reliable component structures

Active Publication Date: 2017-05-17
宁夏公路桥梁建设有限公司
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In the precast construction of bridge prestressed hollow slabs, the traditional method is used to install a 20-meter-long hollow slab side form, which takes more than 2 hours for 5 to 6 people to complete, and the construction efficiency is low, which seriously affects the turnover rate of beam slab prefabricated pedestals.
The traditional installation method is to use wooden wedges and square logs to support the concrete beams poured in advance, but this construction method is likely to cause the side formwork to be not firmly supported, the formwork is easy to run out, leak grout, and the workload of formwork is large. Almost every time When setting up the formwork, the square wood must be sawed to measure, the turnover rate of the square wood is low, the sawdust is seriously harmful to the human body and the environment, and the site is messy, etc.
This method is cumbersome in the construction process, resulting in a waste of labor and materials, which affects the progress of the construction
[0003] So far, there is no equipment and method to overcome the above defects

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A kind of supporting equipment and using method of bridge prefabricated hollow slab side form
  • A kind of supporting equipment and using method of bridge prefabricated hollow slab side form
  • A kind of supporting equipment and using method of bridge prefabricated hollow slab side form

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0023] A kind of supporting equipment and using method about bridge prefabricated hollow slab side formwork, such as figure 1 , 2 , Shown in 3 and 4: it utilizes when pouring the hollow slab prefabricated pedestal 1, after the prefabricated pedestal 1 pre-embeds the fixing part 3, the hollow slab side form 6 is supported by the jack 4 and the adjusting screw 5.

[0024] Such as figure 1 As shown: a sealing pipe 2 is installed on both sides of the longitudinal edge of the hollow plate prefabricated pedestal 1 .

[0025] Such as figure 2 As shown: the embedded fixing part 3 is formed by welding a section of No. 5 small channel steel 8 at both ends of No. 10 I-beam 7 .

[0026] Such as figure 1 , 2 As shown: the pre-embedded fixing part 3 is pre-embedded when pouring the concrete of the prefabricated pedestal 1 of the hollow slab, and is used for supporting the jack 4 and connecting one end of the adjusting lead screw 5 .

[0027] Such as image 3 Shown: described jack 4 ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to supporting equipment for a lateral mould and a using method of the supporting equipment, in particular to supporting equipment for a bridge precast hollow slab lateral mould and a using method of the supporting equipment. During the pouring of a hollow slab precast pedestal, after fixing parts are pre-buried under the precast pedestal, the hollow slab lateral mould is supported by a jack and adjusting lead screws. The using method of the supporting equipment comprises the following steps: during the concrete pouring of the hollow slab precast pedestal, the fixing parts are transversely pre-buried in the pedestal concrete at intervals of 1 m; during the use, the hollow slab lateral mould is hoisted on I-steel by hoisting equipment to be close to a pedestal slurry sealing pipe, and then, the bottom of the lateral mould is tightly jacked by the jack every other 1 m; one ends, connected with the lateral mould, of the adjusting lead screws are connected with corresponding small channel bars every other 1 m, the adjusting lead screws are rotated to correct the lateral mould until the lateral mould meets construction requirements. According to the invention, the structure is simple, the mounting and dismounting are facilitated, the use is flexible, the performance is reliable, the controllability and randomness are high, the construction efficiency is high, the waste of manpower and material is reduced, and high safety and reliability are achieved.

Description

technical field [0001] The patent of the present invention relates to a supporting device and a using method of a side form, in particular to a supporting device and a using method of a bridge prefabricated hollow plate side form. Background technique [0002] In the precast construction of bridge prestressed hollow slabs, the traditional method is used to install a 20-meter-long hollow slab side form, which takes more than 2 hours for 5 to 6 people to complete, and the construction efficiency is low, which seriously affects the turnover rate of beam slab prefabricated pedestals. . The traditional installation method is to use wooden wedges and square logs to support the concrete beams poured in advance, but this construction method is likely to cause the side formwork to be not firmly supported, the formwork is easy to run out, leak grout, and the workload of formwork is large. Almost every time When setting up the formwork, the square wood must be sawed according to the a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): B28B7/00
CPCB28B7/0002B28B7/0017
Inventor 马延安张志涛武文斌金成闫世伟马保忠李海军刘全文韦莉史玉池
Owner 宁夏公路桥梁建设有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products