A Construction Method of Excavating Excavated Soil for Backfilling Underground Foundation Pit
A technology of backfilling and construction method, which is applied in filling, soil protection, infrastructure engineering, etc., can solve the problems of high excavation and filling costs, large excavation and filling transportation volume, and long cycle, so as to achieve good social and economic benefits and ensure compactness Quality, reduction of cut and fill time and cost effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] A construction method for backfilling the excavation soil of an underground foundation pit. The method is to sort and pile the temporary excavation soil on the ground near the deep foundation pit 1 on the site where the original deep foundation pit 1 was excavated, and then use the flushing process to excavate The soil is returned to the original deep foundation pit 1 in the form of mud, and the backfilled soil is compacted by drainage during the backfilling process, and the same layer of soil is balanced and adjusted appropriately, and then backfilled layer by layer until the designed floor elevation is controlled So far; the specific steps of the backfill construction method are as follows:
[0026] The first step is to select the excavated earth stacking site: select several temporary excavated earth stacking sites 2 near the deep foundation pit 1;
[0027] The second step, excavation and stacking of excavated soil: excavation of deep foundation pits, the excavation proce...
Embodiment 2
[0033] In this embodiment, on the basis of Example 1, in the first step, when selecting the excavated soil stacking site 2, set the excavated soil stacking site at the opposite corner of the deep foundation pit 1, thereby shortening the mud transportation distance and improving the filling efficiency; In addition, in order to ensure that the excavated soil stack is not easy to collapse, the height of the excavated soil stack can be 3-4m high.
Embodiment 3
[0035] In this embodiment, on the basis of embodiment 1, when the third part of the backfill system is preset, the mud transportation pipeline 6 adopts a rubber mud pipe with a diameter of Φ120, and the mud transportation pipeline 6 is located on the cement road part of the road. The board frame 8 protected by wooden boards strengthens the protection of the mud transportation pipeline 6 and prolongs the service life of the mud transportation pipeline 6.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com