Construction method of integrated pipe trench in soft soil
A technology of comprehensive pipe trenches and construction methods, applied in the field of geotechnical engineering, can solve the problems of uneven settlement of comprehensive pipe trenches, damage to the main structure of pipe trenches, and influence on road use, etc. low cost effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0042] The embodiments of the present invention will be described in detail below with reference to the accompanying drawings, but the present invention can be implemented in many different ways defined and covered by the claims.
[0043] Such as figure 1 and figure 2 As shown, the preferred embodiment of the present invention provides a kind of construction method of comprehensive pipe ditch in soft ground, and this method comprises the following steps:
[0044] S1: According to the design height of the foundation pit, the multi-level stepped foundation pit 1 and the bottom of the foundation pit 2 connected to the lowest level stepped foundation pit 1 are sequentially excavated by adopting the method of multi-level stepped grading excavation;
[0045] Specifically, according to the design height of the foundation pit, the method of multi-level stepped grading excavation is adopted. Firstly, the highest step foundation pit 1 is dug out, and then the second step foundation pi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com