Unconventional CO2 fracturing site operation technology
An on-site construction, CO2 technology, applied in wellbore/well components, production fluids, earth-moving drilling, etc., can solve problems such as affecting the safe and efficient production of CO
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0036] The present invention will be further described below with reference to the accompanying drawings.
[0037] The present invention provides an unconventional CO 2 The on-site construction process of fracturing includes the following steps:
[0038] (1) Preparation of the main fracturing truck 3: cleaning the upper water chamber and the pump chamber of the large pump to prevent the thread seal of the upper water chamber from being loosely sealed, and in the gas phase CO 2 A puncture occurred while purging the line. Specifically include the following:
[0039] Clean the upper water chamber and large pump chamber of each main fracturing truck 3 one day in advance to remove sand and other debris to avoid clogging the pipeline, and at the same time dry the water and wipe it. Due to liquid CO 2 The temperature is -18°C. If there is moisture, it will freeze instantly, causing the valve head and the valve seat in the large pump to adhere and cannot be separated, or because t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com