Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Construction method of large reinforced concrete prefabricated column and beam lifting auxiliary embedded part

A technology of reinforced concrete and construction method, applied in the direction of manufacturing tools, ceramic molding machines, etc., can solve the problems of high cost and long construction period, and achieve the effect of reducing construction cost, shortening construction period and overcoming long construction period.

Inactive Publication Date: 2015-06-03
MCC5 GROUP CORP SHANGHAI
View PDF6 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

With the actual demand for large-scale modern production, the technological process is complicated and the equipment configuration is more, which puts forward higher requirements for the height, bearing capacity, span and corrosion resistance of the structural workshop. Generally, small reinforced concrete prefabricated columns, Beam engineering technology is very mature, but large-scale reinforced concrete prefabricated column and beam engineering has no mature construction technology with good economy and reliable technology, especially the economic and technical problems of turning over and hoisting large-scale reinforced concrete prefabricated columns and beams , there are disadvantages of high cost and long construction period
[0004] Therefore known large-scale reinforced concrete prefabricated column, beam engineering construction exists above-mentioned inconvenience and problem

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of large reinforced concrete prefabricated column and beam lifting auxiliary embedded part
  • Construction method of large reinforced concrete prefabricated column and beam lifting auxiliary embedded part

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] The present invention will be further described below in conjunction with embodiment and accompanying drawing.

[0035] The large-scale reinforced concrete prefabricated column and beam hoisting auxiliary embedded parts construction method of the present invention comprises the following steps:

[0036] a. Design of embedded iron parts, including the following steps:

[0037] (1) Calculate the basic data of prefabricated reinforced concrete prefabricated columns and beam loads;

[0038] (2) Determine the specifications, models, and layout of the anchor bars of the embedded iron parts, as well as the connection method between the anchor bars and the embedded steel plates;

[0039] (3) Determine the specification and size of the embedded steel plate;

[0040] (4) Determine the specification, size, geometric shape and connection method of the hoisting lug steel plate and the embedded steel plate;

[0041] b. The construction of embedded iron parts includes the following...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
thicknessaaaaaaaaaa
radiusaaaaaaaaaa
thicknessaaaaaaaaaa
Login to View More

Abstract

The invention discloses a construction method of a large reinforced concrete prefabricated column and a beam lifting an auxiliary embedded part. The method is characterized by comprising the steps of: (a) design of an embedded iron part and (b) construction of the embedded iron part, wherein the method comprises the following steps: (1) production of the embedded iron part: firstly, an embedded part anchoring reinforcement is connected with an embedded steel plate according to a design mode; (2) installation construction of the embedded iron part: a template is erected according to the design requirement; poured concrete is compacted and maintained, and the strength thereof must reach the design requirement or the regulations of job specifications; and (3) after the form stripping is performed for the prefabricated column and beam, a lifting lug is connected with the embedded steel plate. The construction method of the large reinforced concrete prefabricated column and the beam lifting the auxiliary embedded part overcomes the defects of high cost and long construction period in a traditional method, and has the advantages of safe and reliable project quality, shortening of construction period and reduction of construction cost.

Description

technical field [0001] The invention relates to a construction method of reinforced concrete pre-embedded parts, in particular to a construction method of auxiliary pre-embedded parts for hoisting of large-scale reinforced concrete prefabricated columns and beams. Background technique [0002] Reinforced concrete prefabricated column and beam engineering is one of the traditional building structure forms. At present, with the rapid development of steel structure engineering, the scope of use in industrial and civil construction projects is gradually decreasing, especially in large-scale ferrous metallurgical industries. However, in some heavy pollution and heavy corrosion industries, due to factors such as economical construction of the main structure of the project, production and maintenance costs, etc., there is still a very wide range of application space and market demand. [0003] Typical application industries of reinforced concrete prefabricated columns and beams ar...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): B28B23/18
CPCB28B23/18
Inventor 高文建聂丁未裴付博雍代文唐益辉代克维
Owner MCC5 GROUP CORP SHANGHAI
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products