Diagnosis method for pre-channel fault of power distribution automation system

A power distribution automation and fault diagnosis technology, applied in the direction of circuit devices, electrical components, etc., can solve problems such as difficulty in finding faults in power distribution terminals, untimely access debugging and fault diagnosis processing, etc., so as to improve the efficiency of fault elimination management and guarantee stable effect

Active Publication Date: 2014-11-05
STATE GRID CORP OF CHINA +4
View PDF2 Cites 23 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to overcome the deficiencies in the prior art, provide a pre-channel fault diagnosis method of the distribution automation system, and solve the problem of untimely access debugging and fault diagnosis processing due to the difficulty in finding faults in power distribution terminals in the prior art technical problem

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Diagnosis method for pre-channel fault of power distribution automation system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0019] The present invention will be further described below in conjunction with the accompanying drawings. The following examples are only used to illustrate the technical solution of the present invention more clearly, but not to limit the protection scope of the present invention.

[0020] The power distribution automation system can manage each power distribution terminal with a network address. The specific implementation is divided into two parts: communication and power distribution terminals: the power distribution automation master station system provides a unified monitoring interface for the communication status of power distribution terminals, and monitors the power distribution terminals. The operating status of the terminal is scanned and monitored in real time, and preliminary classification of front channel failures: network failure, abnormal communication, abnormal message, and service shutdown are displayed to the user in a classified and statistical manner, w...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a diagnosis method for a pre-channel fault of a power distribution automation system. The method comprises the steps of allowing a power distribution automation master station system to monitor an operation state of a power distribution terminal, allowing a communication network management platform to monitor a state of an intermediate link communication equipment, combining communication network management data and the operation state of the power distribution terminal, performing real-time monitoring and management on the power distribution terminal, communication access network equipment, an optical cable and a communication channel resource within the jurisdiction of the power distribution automation system, performing fault analysis and positioning on a communication abnormity state of the power distribution terminal, and issuing a communication abnormity report of the power distribution terminal. The method can find a cause of the pre-channel fault more comprehensively, achieves accurate positioning of a fault node, significantly improves the defect elimination management efficiency of operation and maintenance personnel for the power distribution terminal and communication, and further ensures stable operation of a power distribution network.

Description

technical field [0001] The invention relates to a fault diagnosis method, in particular to a fault diagnosis method for a front channel of a power distribution automation system, and belongs to the technical field of power supply and distribution. Background technique [0002] The distribution automation system is the main project in the distribution link of the smart grid. The construction of the distribution automation system is an important means to improve the reliability and quality of power supply, expand the power supply capacity, and realize the efficient and economical operation of the distribution network. The distribution automation system is mainly composed of a distribution automation master station system, a distribution terminal, a distribution substation, and a communication channel. However, due to the large number of distribution terminals in the distribution automation system, various communication methods, and frequent switch-on and withdrawal of distribu...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): H02J13/00
Inventor 谭志军武会超吴琳孙大雁赵勇吴奕赵家庆尹协文欧阳文宋英华熊浩丁宏恩钱科军吕洋田江陈娜
Owner STATE GRID CORP OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products