Construction device and method for large-span steel girder frame connection platform

A construction device and connecting technology, which is applied in the direction of scaffolding for building structure support, building structure support, building structure support, etc., can solve the problems of high construction cost, heavy construction and dismantling workload, long construction period, etc., and achieve reduction The labor intensity of construction, the progress is smooth and safe, and the effect of reducing construction cost

Active Publication Date: 2014-09-24
浙江浙建钢结构有限公司
View PDF5 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The construction device and construction method of this prior art have the following defects: the steel pipes and fastener materials that are put into the full hall scaffold at one time are many, the consumption is large, and the construction cost is high; It takes a long time and the construction period is long; moreover, the support is dense and occupies all the space under the large-span steel beam frame connection platform, making the space below unusable for a long time; what's more, the support is high, easy to lose stability, and has great safety Hidden danger
From the above analysis, it can be known that the erection of scaffolding for welding construction requires many steel pipes and fasteners, a large workload, and time-consuming and laborious installation and disassembly. Moreover, the most important thing is that the operation is suspended at high altitude. The actual operation is extremely difficult and the construction speed is slow. , low efficiency and great security risks

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction device and method for large-span steel girder frame connection platform
  • Construction device and method for large-span steel girder frame connection platform
  • Construction device and method for large-span steel girder frame connection platform

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0040] The present invention will be further described below in conjunction with the drawings and specific embodiments.

[0041] Such as figure 1 , figure 2 , image 3 , Figure 4 , Figure 5 , Image 6 , Figure 7 As shown, the construction device for a large-span steel beam frame-connected platform of the present invention includes a trolley 1 with rollers 23 and two operating car baskets 2 on both sides of the trolley 1. Each operating car basket 2 is vertically slidably fitted with the trolley 1, that is, the two sides of the trolley 1 are provided with vertical ribs 15, and the inner side of each operating car basket 2 is provided with a vertical guide groove 16, and the trolley 1 The vertical protruding strips 15 on each side are slidingly fitted in the vertical guide groove 16 of the operating car basket 2. Two winches 3 are fixed on the top of the trolley 1, and the draw rope of each winch 3 is fixed to the top of the operating car basket 2; that is, the top of the oper...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction device and method for a large-span steel girder frame connection platform. The device comprises a trolley (1) and operation baskets (2), wherein the top of the trolley (1) is connected with the tops of the operation baskets (2) through a winch (3); a guide rail (6) is arranged at the bottom of each operation basket (2); each guide rail (6) is provided with a second electromagnet and a third electromagnet (8). The method is characterized in that the trolley (1) and the two operation baskets (2) form a tripod-like structure and clamp a main girder (9) or a secondary girder unit to move at a normal section of the main girder (9) or the secondary girder unit; when the trolley (1) arrives at each node, the operation baskets (2) are lifted through the winch (3) so that the operation baskets (2) can be flush with the bottom face of the trolley (1) and pass through the node. By means of the construction device and method, consumption of steel tubes and fasteners can be reduced, construction cost and labor intensity can be lowered, operation is convenient and fast, the construction period is shortened, the construction space below the platform is not occupied, and potential safety hazards are eradicated.

Description

Technical field [0001] The invention relates to a construction technology of a large-span steel beam frame-connected platform in the field of civil engineering, in particular to a construction device and a construction method of a large-span steel beam frame-connected platform. Background technique [0002] Large-span (generally a span of more than 30m) steel beam frame connected platform includes a platform frame formed by connecting and fixing multiple parallel main beams and multiple parallel and perpendicular secondary beams, main beam and secondary beam The top surface is flush; each main beam is a complete steel beam, and its two ends are respectively fixed on the surrounding concrete structure that has been poured. Specifically, the surrounding concrete structure refers to the poured concrete side walls and columns. Or floor slab, pre-embedded steel corbels on the surrounding concrete structure, the two ends of the main beam are welded and fixed with two steel corbels resp...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04G3/34E04B1/342
Inventor 张国松赵银海
Owner 浙江浙建钢结构有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products