A technology of construction survey and catenary, which is applied in the direction of measuring devices, measuring instruments, measuring inclination, etc., can solve the problems of inconvenient operation, large measurement error, and high difficulty of measurement, and achieve the solution of inconvenient use and operation, convenient installation and layout, and anti-corrosion Good dust performance

Active Publication Date: 2014-08-13
中铁二十局集团电气化工程有限公司
View PDF3 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] The technical problem to be solved by the present invention is to provide a method for measuring the anchorage construction of the catenary in the tunnel in view of the deficiencies in the above-mentioned prior art. The method has simple steps, reasonable design, low investment cost, convenient implementation and good use effect. It can solve the problems of inconvenient operation, heavy workload, high measurement difficulty and large measurement error existing in traditional measurement methods.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Anchor mooring construction surveying method for contact network in tunnel
  • Anchor mooring construction surveying method for contact network in tunnel
  • Anchor mooring construction surveying method for contact network in tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0066] like figure 1 As shown in a method for measuring the anchoring construction of the catenary in the tunnel, the constructed catenary is divided into a plurality of anchor sections along the longitudinal extension direction of the tunnel hole 3 from front to back, and anchors are arranged between the front and rear anchor sections. segment joint; the anchor segment joint includes a lower anchor device, the lower anchor device includes a support device, a contact suspension device and a compensation device 7, and the contact wire 5 of the constructed catenary is suspended from the support device through the contact suspension device Above, the support device is an anchor arm 6 whose upper end is fixed on the wall of the tunnel hole (3). When installing the anchoring device, the process is as follows:

[0067] Step 1. Installation of the support device: Install the anchor arm 6 of the currently installed anchor lowering device.

[0068] Step 2: Installation of the compens...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an anchor mooring construction surveying method for a contact network in a tunnel. The contact network to be constructed is divided into a plurality of anchoring sections, wherein an anchoring section joint is arranged between two adjacent anchoring sections, and comprises an anchor mooring device, the anchor mooring device comprises a supporting device, a contact suspending device and a compensating device, and the supporting device is an anchoring arm fixed on the wall of the tunnel. An anchor mooring device is installed by adopting the following steps: installing the supporting device, namely, installing the anchoring arm of the currently installed anchor mooring device; and 2, installing the compensating device, namely, when the compensating device is installed, performing surveying and positioning by adopting a three-dimensional surveying rule, wherein the compensating device is installed by adopting the following processes, namely installing a front side pulley, laying the three-dimensional surveying rule, positioning a guide pulley and installing a compensating rope and a compensating pulley. The anchor mooring construction surveying method is simple, reasonable in design, relatively low in input cost, convenient to realize, good in use effect, and capable of solving the problems of inconvenience in use and operation, large workload, relatively high measurement difficulty, relatively large measurement errors, and the like in a conventional measurement method.

Description

technical field [0001] The invention belongs to the technical field of catenary construction in tunnels, and in particular relates to a method for measuring the anchoring construction of catenary in tunnels. Background technique [0002] The catenary is a high-voltage transmission line erected in a "zigzag" shape above the rail in an electrified railway for the pantograph to draw current. The catenary is the main frame of the railway electrification project. It is a special form of transmission line erected along the railway line to supply power to the electric locomotive. It is composed of contact suspension, support device, positioning device, pillar and foundation. The catenary is usually divided into many independent segments, which are called anchor segments. The bearing cables and contact lines at both ends of the anchor section are fixed on the lower anchor device. [0003] The electrified railway tunnel construction includes construction measurement, drilling, anch...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G01C15/00G01C9/00
CPCG01C9/00G01C15/00
Inventor 谢琪峰王志义李鲁杰刘志富王耀辉邵红军王晓峰严鑫李晓鹏王信
Owner 中铁二十局集团电气化工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products