Cloud testing environment scheduling method and system based on load forecast
A technology of load prediction and scheduling method
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] Example 1: Load Forecasting Operation
[0045] Such as figure 2 As shown, the test host load prediction module 3 compares the historical load of a test host with the load change curve in the test host load change database 4 to find the load change curve that best matches the test host, thereby predicting the test host. , and then sum the predicted loads of all test hosts on a physical node to obtain the predicted load value of the physical node. The test host load prediction module 3 first obtains the historical load of each test host on the physical node, and then compares the historical load of each test host with the load change curve in the test host load change database 4, for each test The host finds the most matching load change curve in the database. The most matching standard is that the Euclidean distance between the historical load curve of the test host and the load change curve in the database is the smallest. Finally, each test is predicted based on the ...
Embodiment 2
[0046] Example 2: Test host migration operation
[0047] When the load of a physical node in the cloud test environment module 5 is lower than the low threshold value set by the system or higher than the high threshold value set by the system, the migration of the test host will occur. The migration operation includes: the test host scheduling module 1 selects a suitable physical node in the cloud test environment module 5, so that after the load forecast value of the physical node is added to the load forecast value of the test host to be migrated, its range is within the lower limit set by the system. Between the threshold value and the high threshold value, if no suitable physical node is found, the migration will not occur. If there are multiple physical nodes meeting the requirements, a physical node will be selected according to the selection strategy of the physical node; the test host scheduling module 1 Migrate the test host to be migrated to the selected physical nod...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com