Rapid construction method for seepage-proof dam of salt pan
A construction method and fast technology, applied in the direction of filling, etc., can solve the problems of increasing the cost of anti-seepage dams, consumption of anti-seepage materials, and complicated process connection, so as to achieve the effects of reducing loss, reducing investment, and reducing construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0026] see Figure 1-Figure 2 , the ultimate goal of the present invention is to combine the anti-seepage material 4 such as figure 2 The correction shown is figure 1 shown.
[0027] refer to Figure 3-Figure 9 , the rapid construction method of the salt field anti-seepage dam in this embodiment, its construction process is excavating the foundation trench - lowering the membrane - filling the foundation trench - pulling the membrane - covering the soil - rolling - re-covering the soil - rolling again, the specific steps are:
[0028] First dig the foundation trench 1, after digging the foundation trench 1, lower the anti-seepage material 4 from the ground surface to the bottom of the foundation trench 1, then fill the foundation trench 1 with soil and roll, after the rolling, put the anti-seepage material near the ground surface 4, assemble and in...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.