Multi-channel large deformation landslide displacement automatic monitoring device and method
An automatic monitoring and displacement monitoring technology, which is applied in the direction of measuring devices and instruments, can solve the problems of troublesome maintenance of measuring instruments and data collection, the inability to collect data in real time, and the inability to monitor and use, so as to reduce maintenance times and maintain Convenience and large range of effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] Such as Figure 1~4 Among them, a multi-channel large-deformation landslide automatic displacement monitoring device includes a steel wire rope 3 for connecting with the anchor bolt 4, and the steel wire rope 3 is connected with the displacement monitoring device 1, and the structure of the displacement monitoring device 1 is:
[0034] Wire rope 3 is connected with wire rope tensioning device 12 after passing through displacement measuring unit 15, and displacement measuring unit 15 is connected with mechanical measuring sensor 14 and / or electronic measuring sensor 16; set mechanical measuring sensor 14 and The electronic measurement sensor 16 can realize on-site reading and remote acquisition at the same time, which improves the adaptability of the device. , can realize remote data collection to improve security. The present invention adopts the connection structure of the displacement measurement unit 15 and the steel wire rope tensioning device 12 behind, so that th...
Embodiment 2
[0042] On the basis of Example 1, such as figure 1 Among them, a kind of method that adopts above-mentioned device to carry out multi-channel large-deformation landslide displacement automatic monitoring comprises the following steps:
[0043] 1. Determine the position of the slip zone through geological exploration, excavate the wellbore 2 that passes through the slip zone vertically, and set multiple anchor bolts 4 in the wellbore 2 from top to bottom;
[0044] 2. One end of the wire rope 3 is connected to the anchor bolt 4, and the other end of the wire rope 3 is connected to the displacement monitoring device 1;
[0045]3. The steel wire rope 3 is tensioned by the steel wire rope tensioning device 12 in the displacement monitoring device 1, and the displacement monitoring can be started;
[0046] Among them, the mechanical measurement sensor 14 is used for on-site patrol readings; when the power supply fails and cannot supply power normally, the measurement data of the me...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com