Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Simulation model and method of long-term active power coordination control in wind generation set

A technology for wind turbines and simulation models, which is applied in wind power generation, parallel feeding arrangement of a single network, etc., can solve problems such as lack of automatic control of active power of wind turbines

Active Publication Date: 2014-01-01
STATE GRID CORP OF CHINA +2
View PDF1 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In actual engineering, when simulating and analyzing the dynamic behavior of large-scale wind farms connected to the grid, there is still a lack of models for the automatic control of active power of wind turbines and the cooperation between wind farms and grid AGC

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Simulation model and method of long-term active power coordination control in wind generation set
  • Simulation model and method of long-term active power coordination control in wind generation set
  • Simulation model and method of long-term active power coordination control in wind generation set

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0065] Embodiment 1 provided by the present invention is an embodiment of a simulation model for long-term active power coordinated control of wind turbines, such as figure 2 Shown is a schematic structural diagram of an embodiment of a simulation model for long-term active power coordinated control of a wind turbine provided by the present invention.

[0066] In the first embodiment, the output plan curve of the dispatching arrangement of the wind turbines received input is formulated by the dispatching department according to the current wind farm operation conditions (including wind speed, wind turbine output, etc.) and combined with wind power prediction and load prediction. In the wind power output curve for a period of time in the future, the dispatching output plan includes both a fixed long-term output plan (with reference to the annual wind power output plan and daily plan), and a variable short-term dispatching output plan. The output plan curve is in the form of ...

Embodiment 2

[0088] The second embodiment provided by the present invention is an embodiment of a simulation method for medium and long-term active power coordinated control of wind turbines. In the second embodiment, the dispatching arrangement output plan curve in step S1 is determined by the dispatching part according to the current wind farm operation conditions. (including wind speed, wind turbine output, etc.), and combined with wind power forecast and load forecast, formulate a wind power output curve in the future. The dispatching output plan includes a fixed long-term dispatching output (with reference to the wind power output annual plan and daily plan) and a variable short-term dispatching plan. The form of the schedule output plan curve includes a piecewise ramp function, a sine wave function, or a composite curve of both, as well as a discrete single-point form.

[0089] The AGC real-time regulation command signal in step S1 includes: the AGC in the power grid automatically pe...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a simulation model and a method of long-term active power coordination control in a wind generation set. The simulation model comprises an input signal receiving module, a signal selection processing module, a working point determining module and a selection executing module, wherein the input signal receiving module, the signal selection processing module, the working point determining module and the selection executing module are connected in sequence. The input signal receiving module receives the input planning curve of scheduling and AGC real-time regulation command signals of the wind generation set, the signal selection processing module obtains the target output of the wind generation set, the working point determining module determines the rotating speed corresponding to the target output of the wind generation set, and the selection executing module determines the operation area of the wind generation set and makes a choice of carrying out pitch angle control or active power control over the wind generation set. The simulation model and the method of the long-term active power coordination control in the wind generation set can reflect the fact that the wind generation set actively participates in the adjustment of a power system in the active power and the frequency, and carries out peak adjustment by matching with AGC and scheduling output, and provides the basis for researching the dynamic behavior of the wind generation set after grid connection.

Description

technical field [0001] The invention relates to the field of power system simulation modeling, in particular to a simulation model and method for medium and long-term active power coordinated control of wind turbines. Background technique [0002] In recent years, many large-scale wind power bases have been completed and put into operation, and large-scale wind power grid-connected operation has brought huge economic benefits. At the same time, it has also changed the original power supply structure. It affects the reactive power and voltage of the power grid in local areas, but it rises to affect the frequency stability and active power balance of the large power grid. Therefore, the power grid puts forward higher requirements for active power control, peak regulation, and frequency regulation after large-scale wind power is connected. [0003] The active power control of wind power has clear requirements: the wind farm must have the ability to adjust the active power and ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/38
CPCY02E10/763Y02E10/76
Inventor 刘涛宋新立仲悟之侯俊贤吴国旸叶小晖
Owner STATE GRID CORP OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products