Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Hanging bracket supporting system of side-span cast-in-place section and implementation method thereof

A support system and cast-in-place technology, which is applied in the erection/assembly of bridges, bridges, buildings, etc., can solve the problems of narrow space and insufficient height between cast-in-place beams and transition piers, and achieve favorable construction quality and material consumption little effect

Active Publication Date: 2014-01-01
CHINA FIRST HIGHWAY ENG
View PDF4 Cites 22 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0012] The technical problem to be solved by the present invention is to provide a construction method for the side-span cast-in-place section of a large-span continuous bridge, which solves the problem of narrow space and insufficient height between the beam body of the cast-in-place section and the transition pier, and provides hangers between the cantilever end and the transition pier. The support method of the pier top overcomes the adverse effects of the cantilever end on the concrete of the cast-in-place section of the side span due to the cyclic deflection of the sunshine temperature difference

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Hanging bracket supporting system of side-span cast-in-place section and implementation method thereof
  • Hanging bracket supporting system of side-span cast-in-place section and implementation method thereof
  • Hanging bracket supporting system of side-span cast-in-place section and implementation method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0037] Such as figure 1 , figure 2 As shown, the design structure of the side span cast-in-place section of a long-span continuous bridge includes transition pier 1, cantilever end beam body 6, cast-in-place beam body 7, closing section beam body 9, permanent support 8 and permanent support Cushion Stone 81. The lengths of the beams in the cast-in-place section and the closing section are 8.31 meters and 2.0 meters respectively, and the height of the beams is 5.0 meters. The construction sequence is: first construct the transition pier 1, then construct the permanent support pad stone 81, and install the permanent support 8; after the cantilever end beam body 6 is completed, construct the side span cast-in-place beam body 7, and finally construct the closing beam body 9.

[0038] Such as image 3 , Figure 4 , Figure 5 As shown, the hanger support system of the present invention is composed of several load-bearing longitudinal beams 2, longitudinal beam supports 3, canti...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

Common methods of construction of side-span cast-in-place sections of long-span continuous bridges of bridge engineering can be summarized into a floor stand method, an attached support method, a hanging bracket method and the like. Due to the limits of terrain conditions, the overhang length and the carrying capacity of a cradle in the floor stand method, the attached support method, the cradle hanging bracket method, the length of a side-span cast-in-place section is often reduced to facilitate construction, and further the bridge structure is not reasonable. The invention provides a hanging bracket supporting system of a side-span cast-in-place section and an implementation method thereof, the hanging bracket supporting system of the side-span cast-in-place section and the implementation method thereof are free from the restrictive conditions of the terrain conditions, the overhang length and the carrying capacity of the cradle and are applicable to the construction of relatively long side-span cast-in-place sections. Besides, according to the hanging bracket supporting system of the side-span cast-in-place section and the implementation method thereof, the problems of small space and insufficient height between a bridge body of a cast-in-place section and a transitional pier are effectively solved, a supporting method of a hanging bracket between a cantilever end and a transitional pier top is provided, adverse effects of the cantilever end on the concrete of the side-span cast-in-place section due to circulating vibration of sunshine temperature differences can be avoided, construction quality control can be facilitated, the material utilization amount is small, and a feasible approach is provided for improvement on side-to-middle span ratio of bridges.

Description

technical field [0001] The invention relates to a construction method mainly used for long-span continuous bridges, in particular to a side-span cast-in-place hanger support system and an implementation method thereof, belonging to the field of bridge engineering. Background technique [0002] Long-span continuous bridges include continuous rigid frame bridges and continuous girder bridges constructed by cantilever casting method. The beam body of a long-span continuous bridge is divided according to the construction site, including the cast-in-place section at the pier top, the cast-in-place section, the side-span cast-in-place section and the closing section. The construction sequence is: first construct the cast-in-place section of the pier top, then install the hanging basket on the cast-in-place section of the pier top, construct the cantilever section with symmetrical cantilever, complete the construction of the side-span cantilever section before the construction of t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00
Inventor 张志新田克平单晓晴
Owner CHINA FIRST HIGHWAY ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products