A technology of iron coke and blast furnace, which is applied in the field of iron coke for blast furnace and its preparation, which can solve the problems of increasing coking cost, harsh operating conditions, and difficulty in meeting large-scale blast furnaces, and achieves reduction of coke ratio and pig iron cost, reduction of CO2 emissions, The effect of meeting the requirements of blast furnace ironmaking

Inactive Publication Date: 2013-12-25
WUHAN UNIV OF SCI & TECH
View PDF6 Cites 83 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0012] The above-mentioned iron coke production method mainly has the following problems: 1) It is necessary to cold-press the mixture of raw coal and iron ore to form a block and dry distillation to produce iron coke. The working conditions are poor and the output is low, which is difficult to meet the needs of large-scale blast furnaces; 2. ) Dry distillation with a vertical distillation furnace is not suitable for domestic ordinary coke oven production; 3) Some methods require the use of binders to increase the strength of iron coke, but the use of binders will increase the cost of coking, and at the same time, the operating conditions are harsh and pollute surroundings

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0034] The mixed coal is blended according to the following mass percentages: 1 / 3 coking coal 27%, coking coal 42%, lean coal 9%, gas fat coal 8%, fat coal 14%; particle size is 2mm (standard GB / T19077.1-2008 is adopted).

[0035] Iron ore powder is selected from Canadian iron ore powder Fe 2 o 3 77.27%, FeO0.82%, SiO 2 3.97%, Al 2 o3 0.27%, CaO0.08%, MgO0.01%, S0.022%, P0.020%, T.Fe66.50%; particle size is 0.8mm (standard GB / T10322.7-2004).

[0036] Mix 5% iron ore powder and 95% mixed coal according to the mass percentage and mix evenly, then adjust the water content of the mixture to 10% and mix evenly, put it into an iron box, and tamp it to a bulk density of 1.1t / m 3 . When the furnace temperature is 800°C, put the coal together with the iron box into the coke oven, increase the temperature according to the 2°C / min program, and stew the oven for 90 minutes. When the center temperature of the coke cake is 980°C, the coke will be released. The coke is quenched and iron...

Embodiment 2

[0039] The mixed coal is batched according to the following mass percentages: 1 / 3 coking coal 25%, coking coal 40%, lean coal 7%, gas fat coal 6%, fat coal 12%; particle size is 2mm.

[0040] The iron ore powder is selected from western Hubei iron ore powder Fe 2 o 3 77.90%, FeO0.82%, SiO 2 11.59%, Al 2 o 3 4.55%, CaO0.19%, MgO0.34%, S0.022%, P0.134%, T.Fe55.15%; particle size is 0.8mm.

[0041] Mix 10% iron ore powder and 90% mixed coal according to mass percentage and mix evenly, then adjust the water content of the mixture to 10% and mix well, put it into an iron box, and tamp it to a bulk density of 1.0t / m 3 . When the furnace temperature is 800°C, put the coal together with the iron box into the coke oven, increase the temperature according to the program of 2°C / min, and stew the oven for 120 minutes. The coke is quenched and iron coke is obtained after cooling.

[0042] Performance test: M 25 85.67%, M 10 is 8.30%, CRI is 26.94%, and CSR is 55.58%.

Embodiment 3

[0044] Coal blending is according to embodiment 1 batching.

[0045] The iron ore powder is Canadian iron ore powder, Fe 2 o 3 77.27%, FeO0.82%, SiO 2 3.97%, Al 2 o 3 0.27%, CaO0.08%, MgO0.01%, S0.022%, P0.020%, T.Fe66.50%; particle size is 0.8mm.

[0046] According to the mass percentage content of 15% iron ore powder and 85% coal, mix and mix evenly, then adjust the water content of the mixture to 10%, mix well, put it into an iron box, and tamp it to a bulk density of 0.9t / m 3 . When the furnace temperature is 800°C, put the coal together with the iron box into the coke oven, increase the temperature according to the program of 2.5°C / min, and stew the oven for 100 minutes. When the center temperature of the coke cake is 1000°C, the coke is discharged. The coke is quenched and iron coke is obtained after cooling.

[0047] Performance test: M 25 83.27%, M 10 is 8.30%, CRI is 38.39%, and CSR is 46.14%.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
particle sizeaaaaaaaaaa
particle sizeaaaaaaaaaa
particle diameteraaaaaaaaaa
Login to View More

Abstract

The invention relates to iron coke for a blast furnace and a preparing method thereof. The iron coke comprises 5wt%-20wt% of iron ore powder and 80wt%-95wt% of mixed coal; the mixed coal is formed by mixing 25wt%-29wt% of one third of coking coal, 40wt%-44wt% of coking coal, 7wt%-11wt% of lean coal, 6wt%-10wt% of gas-fat coal and 12wt%-16wt% of fat coal; the iron ore powder and the mixed coal are mixed uniformly with water and tamped before entering the blast furnace, and are placed into the blast furnace when the temperature is 800 DEG C, the temperature is increased at the speed of 2 DEG C per minute to 3 DEG C per minute, the iron ore powder and the mixed coal are discharged from the blast furnace when the temperature is 950-1050 DEG C, and the iron coke is obtained by adopting a wet way of quenching the coke. According to the iron coke and the preparing method, the performance, the ratio, the particle size and the composition and the like of the iron ore powder and the mixed coal are optimized, and the strength and the reactivity of the iron coke can meet the requirement of the blast furnace process under the circumstance of not adding binding agents.

Description

technical field [0001] The invention belongs to the field of iron and steel metallurgy, and in particular relates to an iron coke for a blast furnace and a preparation method thereof. Background technique [0002] The idea of ​​adding iron-containing materials to coal to make iron-containing coke was first proposed by H.Wending in 1865. At that time, the purpose of making iron coke was mainly to sinter iron-containing materials during coking, so as to save the process of lump ore or sintering and add iron-containing materials to the blast furnace, mainly using coal with good coking properties such as fat coal, etc. Iron coke. The former Soviet Union has made great contributions to the use of iron-containing blast furnace ash to smelt iron coke. In 1955, North Korea was at 73m 3 Experiments were carried out on iron coke smelted with 5% ore powder in a small blast furnace. Limited by the level of coking technology at that time, the mechanical strength of iron coke was poor...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): C10B57/04C21B5/00
Inventor 史世庄毕学工孙超祺李鹏鲁帅金焱林志龙张慧轩董晴雯周进东吴琼
Owner WUHAN UNIV OF SCI & TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products