Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Real-time electric vehicle and wind power collaborative dispatching and optimizing method

A technology of electric vehicles and optimization methods, which is applied in the direction of AC network voltage adjustment, wind power generation, combustion engines, etc., can solve the problems of increased cost of wind power grid connection, large time span, and large time scale span, so as to improve energy saving and emission reduction benefits, Shorten calculation time and meet the effect of real-time scheduling

Active Publication Date: 2015-04-08
SOUTHEAST UNIV
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

On the one hand, it is necessary to add additional conventional units for backup to increase the reserve capacity of power grid peak regulation and frequency regulation, which in turn increases the cost of wind power grid connection; , which has a greater impact on power grids that are dominated by thermal power and have a high load peak-to-valley difference
[0003] In addition, as an important means of reducing petroleum fuels and reducing carbon emissions, the state has introduced various measures to vigorously increase the penetration rate of electric vehicles. The large-scale charging load of electric vehicles will bring a great impact on the existing power grid and also affect the power grid dispatching. brings difficulty
The traditional dispatching method in China mainly adopts the dispatching method combining artificial day-ahead dispatching plan and automatic generation control (AGC) two time scales. These two time scales span a large span and the dispatching mode is relatively extensive.
After large-scale wind power and electric vehicles are connected to the power grid, the traditional dispatching method has the following problems: On the one hand, there is often a large deviation between the results of the day-ahead load forecast and the actual load, which makes the implementation of the day-ahead plan very different from the actual situation; On the one hand, the time span between day-ahead scheduling and AGC is too large, and the day-ahead plan deviation, load and random disturbance of wind power are all borne by the AGC unit, and the adjustable capacity of AGC is often insufficient.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Real-time electric vehicle and wind power collaborative dispatching and optimizing method
  • Real-time electric vehicle and wind power collaborative dispatching and optimizing method
  • Real-time electric vehicle and wind power collaborative dispatching and optimizing method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] The present invention will be further described below in conjunction with the accompanying drawings.

[0025] A collaborative real-time scheduling optimization method for electric vehicles and wind power. For wind power generators connected to the power grid and electric vehicle charging loads, wind power fluctuations are absorbed by scheduling the size of the electric vehicle charging loads; the size of the electric vehicle charging loads is optimized The optimal dispatching model of dispatching takes the minimum sum of output adjustments of all conventional generators in the power grid as the objective function, takes the safe and stable operation of the power grid as the constraint condition, and solves the optimal dispatching model by quadratic programming method or interior point method ; When the wind power output exceeds the available electric vehicle charging load capacity in the area, take measures to "abandon wind" for the excess wind power output.

[0026] Th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a real-time electric vehicle and wind power collaborative dispatching and optimizing method. The method includes: charging and loading a wind power generator and an electric vehicle accessing into the power grid, absorbing wind power fluctuation by dispatching charging and loading of the electric vehicle, and for an optimizing and dispatching model for charging and loading of the electric vehicle, solving the optimizing and dispatching model by minimizing the sum of output adjustment amounts of all conventional generators in the power grid as a target function and utilizing a quadratic programming method or an interior point method under constraint condition of safe and stable operating of the power grid. In the real-time electric vehicle and wind power collaborative dispatching and optimizing method, the used target function is simple, computing load is reduced, computing time is shortened, and requirement for real-time dispatching can be met.

Description

technical field [0001] The invention relates to an electric vehicle and wind power cooperative real-time scheduling optimization method, which belongs to the smart grid technology. Background technique [0002] Power system dispatching is an effective management method adopted to ensure the safe and stable operation of the power grid, reliable external power supply, and orderly progress of various power production tasks. With the maturity of wind power technology and the decline of cost, the installed capacity of wind power in the country has grown rapidly. After large-scale wind power is connected to the grid, the fluctuation and intermittent characteristics of wind power output have brought major challenges to the active power dispatching of the power grid. On the one hand, it is necessary to add additional conventional generating units to increase the reserve capacity of power grid peak regulation and frequency regulation, which in turn increases the cost of wind power gr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): H02J3/12H02J3/28H02J3/38
CPCY02E10/763Y02E70/30Y02T10/56Y02E10/766Y02E10/76Y02T10/40
Inventor 黄学良孙毅强浩张齐东
Owner SOUTHEAST UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products